My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BC 1986 07 07
CabarrusCountyDocuments
>
County Clerk
>
MEETING MINUTES
>
Board of Commissioners
>
1986
>
BC 1986 07 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2002 3:19:04 PM
Creation date
11/20/2001 7:09:48 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
7/7/1986
Board
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
482 <br /> <br />This is a Task Order attached to and made a part of the Agreement dated <br />February 26, 1985 between Cabarrus County, North Carolina (OWNER or COUNTY) <br />and Camp Dresser & McKee (ENGINEER or CDM) for professional services. <br /> <br />The Basic Services of ENGINEER as described in Section 1 of said Agree- <br />ment are amended and supplemented as follows: <br /> <br />The ENGINEER agrees to complete an application to the State of North <br />Carolina for an amendment to the County's existing landfill permit and <br />prepare an operations plan for the Landfill. <br /> <br /> SCOPE OF SERVICES <br /> FOR <br />LANDFILL PERMIT AMENDMENT APPLICATION <br /> <br />AND OPERATIONS PLAN <br /> <br />TASK A - BOUNDARY AND TOPOGRAPHICAL SURVEY <br />For the purposes of preparing the necessary plans for the landfill <br />permit amendment, a detailed boundary and topographical survey of the <br />existing landfill property will be required. We will assist the County <br />in retaining a survey firm to conduct the boundary survey and produce a <br />base map with a 5 foot contour interval. <br /> <br />TASK B - PREPARATION OF PERMIT AMENDMENT APPLICATION <br />Prepare a permit amendment application for State review. The amendment <br />application will consist of three engineering plans including a final <br />contour plan, an erosion control and sedimentation plan, and a cover <br />material excavation plan along with accompanying text. <br /> <br />TASK C - SUBMIT PERMIT AMENDMENT APPLICATION TO COUNTY <br /> <br />Submit the permit amendment application package to the County for <br />review. Attend one meeting with the County to present the results. <br /> <br />TASK D - SUBMIT PERMIT AMENDMENT APPLICATION TO STATE <br /> <br />Present and submit the permit amendment application to the Division of <br />Health Services, Solid and Hazardous Waste Management Branch. Address <br />State review comments and resubmit the permit amendment application if <br />necessary. <br /> <br />TASK E - PREPARATION OF OPERATIONS PLAN <br />Based on the engineering plans completed for the landfill permit amend- <br />ment application, prepare an operations plan for the landfill. The <br />operations plan will revise and/or supplement information contained in <br />the April 1986 Landfill Study in the following areas: <br /> <br />Outline the sequence and methods of landfilling. <br />Detail construction methods to control infiltration and minimize <br />leachate production outbreak. <br />Review cover material and closure requirements. <br />Refine estimate of remaining useful life of the landfill. <br />Refine cost estimates for initial site preparation, closure, and <br />annual operating costs for the landfill. <br /> <br />TASK F - PRESENTATION OF OPERATIONS PLAN <br /> <br />Submit 10 copies of the operations plan to the County complete with <br />text, tables, graphs, and two or three plan sheets. Attend one meeting <br />with the County to present the results and recommendations of the <br />operations plan. <br /> <br />The responsibility of OWNER as described in Section 2 of said Agreement <br />are amended and supplemented as follows: <br /> <br />OWNER shall provide equipment and labor required for the surveyor to <br />gain access to the site. <br /> <br />The time periods for the performance of ENGINEER's services as set forth <br />in Section 3 of said Agreement are amended and supplemented as follows: <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.