My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19890807
CabarrusCountyDocuments
>
County Clerk
>
AGENDAS
>
1989
>
AG19890807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:28 AM
Creation date
2/7/2003 11:29:59 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/7/1989
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Service <br /> <br /> IBM will provide Csbarrus County DP with the Services described in this section at <br /> each Location identified by you and agreed to by IBM. <br /> <br /> G~bfe M~n~gement Services <br /> <br /> IBM will provide Cabsrrus County DP with the following Services including the <br /> necessary project planning and management to support the Installation of a cabling <br /> system ut each Location identified by you and agreed to by IBM. <br /> <br /> Using information supplied by you as identified nnder the section Conditions of <br /> Service, IBM will develop and deliver to you so Implementation Plan. This plan will <br /> set forth for each Uustomnr Location 1) its estimated start'and completion dates, 2) <br /> the contact persons for yon ~nd IBM, 3) the 1BM system(s) and other equipment to be <br /> located at that Locution, 4) any information provlded by you affecting the Services, <br /> and 5) the estimated remaining pro rata portion of the Services Charge due for such <br /> location after payment of any Initial Charges. <br /> <br /> IBH will review the Implementation Plan with you. You may recommend changes and any <br /> agreed upon changes will be incorporated into the plan. IBM will then provide to you <br /> s completed copy of the plan. <br /> <br /> Gable Design: Using the informatio~t provided by Caburrus County DP under the section <br /> Conditions of Service and gathered by IBM Field Personnel, IBM will design a <br /> cns~omfzed cabling network which will be suitable for installation at each Location <br /> Identified by you and agreed to by IBM. The details of tbis physics] design will be <br /> delivered to you in a report containing the following Information: <br /> <br /> A network confignration diagram. <br /> · Location, numbering, and plugging sequence charts of the network cablRs. <br /> · Cabling schematics (gable Design Drawings / §lue Prints) of the Customer's <br /> cabling network. <br /> h listing of all necessary materials including qusntity and IBM <br /> part/specification number. <br /> · A package of labels for use in numbering cables and associated accessories <br /> during installation. <br /> · A Scope of Work for contractor use when installing the cabling network. <br /> Cable test forms to be used by the contractor to verify each cable installed. <br /> <br /> IBM wil~ provide the necessary materials and will select and retain contractors to <br /> install your newly designed IBM Cabling System. The details of the cable installation <br /> Services are ideotified under the topic Contractor }lanagement Services in this <br /> section. <br /> <br /> Coofracfor Man8$emomt: IBM will engage the services of a contractor to provide labor, <br /> material and equipment to perform the following services at your Location. <br /> <br />!. SupplF and instal] 169 cable drops that will use mainly Type 2 cable. It will <br />~ be installed with all associated data connectors, face-plates and accessories <br /> required for a complete cabling nstwork. <br /> · Label each cable drop at the distribution panel and at the workstation. <br /> · Supply and install the bulk riser cable from the MDF to each IDF and terminate <br /> each riser cable on 66 pin blocks. <br /> Test and verify existing cables to the tie-'in to the network. <br /> · All cables will run in the ceiling cavity to the existing conduit. They will <br /> run down inside the wall to an IBM Type 2 face plate. <br />~ · Test tnst~llation of all cable to IB~[ specification. <br /> <br /> 7910127 ( 06/09/89 ) cO..q (a) Page 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.