My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19890807
CabarrusCountyDocuments
>
County Clerk
>
AGENDAS
>
1989
>
AG19890807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:28 AM
Creation date
2/7/2003 11:29:59 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/7/1989
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Service <br /> <br /> IBM will provide Cabarrus County DP with the Services described in this section at <br /> each Location identified by you and agreed to by IBM. <br /> <br /> Relocation Services <br /> <br /> IBM will provide the following Relocation Services for the Machines and Customer <br /> Location(s) identified in tbs section entitled "Machines and Customer Location(s)". <br /> <br /> The term "Machines" as used bare refers to IBM machines and to selected non-IBM <br /> machines. <br /> <br /> IBM will work with you to develop a Relocation Plan tailored to your specific <br /> relocation requirements. IBM will use information you have provided to i) produce a <br /> project schedule showing key milestones; and 2) provide installation planning <br /> information for your Machines, including floor plans, cable diagrams, and requirements <br /> for power, air conditioning, and weight distribution. IBM will review this Relocation <br /> Plan with you and incorporate any agreed upon changes, provide you with a completed <br /> copy of the Plan, end assume project leadership for the relocation of your Machines. <br /> <br /> IBM will use the Relocation Plan to coordinate tile relocation of your Machines. IBM <br /> will: <br /> <br /> · Assume project leadership; <br /> · Schedule, coordinate and document meetings; <br /> Submit orders for required cables and packing; <br /> · Interface with vendors, as ~equired; and <br /> · Provide guidance to the mover. <br /> <br /> Discontinuance Services: IgM will prepare your Machines for shipment in accordance <br /> with IBM's standard practices. IBM will assist you in identifying the items normally <br /> shipped with the Machines; and, at your request, will place manuals, diagnostics, <br /> covers, cables, small units and other items in shipping containers. <br /> <br /> Iustafist~on Services: IBM wilt assemble your Machines, including tile removal of any <br /> internal packing materials and the interconnection of required IBM cables. IBM will <br /> test the Machines, including active IBM features, and install or reconfigure tbs <br /> Machine diagnostics. <br /> <br />Mover Services: IBM Will coordinate all activities associated with the moving and <br />shipping of tile Machines. IBM will: <br /> <br /> Attend a review meeting; <br /> Prepare a requirements list; <br /> Contract with a moving firm; <br /> Notify the mover of the moving requirements; <br /> Conduct a site survey with the mover; <br /> Provide move schedules; <br /> Arrange for interim storage if required; and <br /> Provide guidance for the move. <br /> <br />In addition, IBM will be responsible for all physical loss or damage to the Machines, <br />while being disassembled, transported, and assembled in tile new Customer Location, <br />IBM's responsibility does not include physical loss or damage to such Machines which <br /> <br />contractors, occurs while not under control of IBM personnel or IBM-selected independent <br /> Ail furniture and fixtures, from the Data Center, are included in this move. <br /> <br />7917204 ( 08/03/89 ) ~5} Page 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.