My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19890807
CabarrusCountyDocuments
>
County Clerk
>
AGENDAS
>
1989
>
AG19890807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:28 AM
Creation date
2/7/2003 11:29:59 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/7/1989
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Applicant shall employ at his own proper cost and expense s Profes- <br />sional Engineer registered in North CarOlina who shall design, lay out <br />and supervise the construction of these!certain water lines. Complete <br />plans and profiles.detailing all propose~ construction .and equipment <br />must be approved by the Director p~ior ~o.beginning any construction. <br />Said construction plans shall be prepared Distribt standard plan and <br />profile paper as per District Standards. <br /> <br />The Applicant furthers agrees that upon.appr6val of said Contractor <br />an~ water plans by the Director th~ owner of' said properties request- <br />ing water service shall guarantee the'installation of the required <br />water system. Upon completion of the water system as described, <br />written notice thereof shall be given by the Applicant tO the Director, <br />who shall cause a final inspection of the water ~ystem to be made and <br />shall within thirty (30) days accept the system, for the District, <br />provided all stipulations bf this contract have been met. <br /> <br />After completion of all construction, the Applicant sha~l furnish the <br />original drawings'of all construction plans, revised to show any and <br />all revisions encountered during construction, to the District marked <br />"As-Built". The final plans shall show the actual condition in which <br />the facility was physically constructed and/or installed. ~urther, the <br />final plans shall show the correct losation of the facility as it <br />relates to easements, right-of-way lines, property lines, buildings, <br />underground and/or overhead utility lines~ roadways, railroads, and <br />all other physical features that would have any effect or ~fluence <br />upon the constructed facility. The Professional Engineer employed <br />to design the facility shall be responsible for the accuracy and <br />completeness of the facility as shown on the final edition of the <br />original construction plans. These original drawings shall become <br />the property of the District~ <br /> <br />It is understood and agreed that when the described water system is <br />constructed according to the plans~ specifications, and standards of <br />the District, said water system shall automatically become the property <br />of the District without cost to the District, and without further <br />agreement in connection therewith. <br /> <br />The Applicant, ha~ing constructed the aforesaid water system at his <br />own proper cost and expense and outside the District's standard policy <br />for water extensions, agrees to waive all claims for compensation or <br />monies refundable for any capital facilities constructed. <br /> <br />Indemnification of the District. The Applicant will indemnify, hol~ <br />harmless and keep harmless, the District and its agents and employees <br />from and against all claims, damages, losses and expenses - including <br />attorney's fees - arising out of or resulting from the performance of <br />the work, provided ~hat any such claim, damage, loss or expense is <br />attributable to bodily injury, sickness, disease or death, or to injury <br />to or destruction of tangible property including the loss of use <br />resulting therefrom, and is caused in whole or in part by any negligent <br />or willful act or omission of the A?PLICANT, LICENSED UTILITY CONTRACTOR, <br />ANY SUBCONTRACTOR IS) thereof or anyone directly or indirectly employed <br />by any of them or anyone for whose acts any of them may be liable. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.