My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BC 1991 02 04
CabarrusCountyDocuments
>
County Clerk
>
MEETING MINUTES
>
Board of Commissioners
>
1991
>
BC 1991 02 04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2002 3:30:09 PM
Creation date
11/21/2001 1:12:17 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
2/4/1991
Board
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
34 <br /> <br /> Line Item Present Approved Revised <br />Account Number Budget Increase Decrease Budget <br /> <br />01-6-58-34-531 $103,275.00 275.00 <br /> WIC Grant <br /> <br />$103,550.00 <br /> <br />58-80-610 $ 1,030.00 275.00 $ 1,305.00 <br /> Travel <br /> <br /> UPON MOTION of Commissioner Hamby, seconded by Commissioner Barnhart and <br />unanimously carried, the Board approved the following change orders for the <br />Cabarrus County Senior Center. <br /> <br />CHANGE ORDER NUMBER: One <br />CONTACT FOR: Single Prime <br />CONTRACTOR: Liles Construction Company <br /> <br />The Contract is changed as follows: <br /> <br />1> <br /> <br />2) <br /> <br />3) <br /> <br />4) <br /> <br />5) <br /> <br />6) <br /> <br />7) <br /> <br />8) <br /> <br />9) <br /> <br />10) <br />11) <br /> <br />For the survey of the site to establish the control lines on site so that <br />they comply with the recorded boundary information. ADD $230.00 <br />Substitute two 5 ton HVAC units and electrical wiring for the one 10 ton <br />HVAC unit specified in the plans. ADD $1,155.00. <br />Increase the length of all window types "A", "B" & "C" and change the <br />windows in multi-purpose room from type "A" to type "B". ADD $248.00. <br />Construct a masonry fireplace and chimney with a full brick profile in <br />lieu of the modular fireplace specified in the plans. ADD $1,918.00. <br />Install an attic access hatch in the ceiling of the font canopy. ADD <br />$254.00. <br />Install an additional catch basin on the north side of the driveway <br />entrance and install 80 lineal feet of 15" RCP to run from that catch <br />basin toward the northeast corner of the parking lot. ADD $2,302.00. <br />Painting subcontractor to furnish payroll reports that meet the federal <br />wage reporting guidelines. ADD $402.00. <br />Install gas piping rough-in for future gas logs at fireplace. ADD <br />$317.40. <br />Flooring subcontractor to install vinyl flooring in color patterns. ADD <br />$776.25. <br />'Reduce cost of hardware purchase. DEDUCT $2,457.75 <br />Reduce cost of brick purchase. DEDUCT $1,505.00. <br /> <br />TOTAL $3,639.90 <br /> <br />CHANGE ORDER NUMBER: Two <br />CONTACT FOR: Single Prime <br />CONTRACTOR: Liles Construction Company <br /> <br />The contract is changed as follows: <br /> <br />1) <br /> <br />2) <br /> <br />3) <br /> <br />4) <br /> <br />5) <br /> <br />Provide and install Food Service Equipment detailed on the Kitchen <br />Equipment Schedule, Sheet B-1 issued December 15, 1990. ADD $19,057.00. <br />Provide electrical changes for kitchen area as detailed on revised Sheets <br />E-1 thru E-6 and dated December 14, 1990. ADD $9,972.00. <br />Provide plumbing changes for kitchen area as detailed on revised sheets <br />P-1 thru P-4 and dated December 14, 1990. ADD $4,750.00. <br />Provide HVAC changes for kitchen area as detailed on revised Sheets M-1 <br />thru M-2 and dated December 14, 1990. ADD $3,600.00. <br />Single Prime Contractor's Overhead and Profit for Items 1 thru 4. ADD <br />$5,606.85. <br /> <br />TOTAL: $42,985.85 <br /> <br />(Changes to the kitchen were approved by the Board of Commissioners <br />on December 11, 1990, at a cost not to exceed $48,000. This change <br />order lists those specific changes to the kitchen.) <br /> <br /> UPON MOTION of Chairman Simmons, seconded by Commissioner Carpenter and <br />unanimously carried, the Board set a public hearing for 8:00 P.M. on Monday, <br />March 4, 1990, in the Auditorium of the Historic Courthouse to consider the <br />following road name change: B-Ford Road to Carriker Road. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.