My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BC 2004 06 24
CabarrusCountyDocuments
>
County Clerk
>
MEETING MINUTES
>
Board of Commissioners
>
2004
>
BC 2004 06 24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2009 3:09:50 PM
Creation date
8/30/2004 10:30:20 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
6/24/2004
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 24, 2004 Page 547 <br /> <br />When building permits are requested prior to completion of all improvements in <br />a development, the following conditions shall apply <br /> <br />Detailed estimates of all required improvements shall be submitted. <br />The estimates shall be signed by licensed contractor(s) or <br />engineer(s) when applicable. <br /> <br />2 0 <br /> <br />These estimates shall be reviewed and approved by a consulting <br />engineer chosen by the County. The applicant for a bond/letter of <br />credit shall be responsible for all costs associated with the <br />outside engineering review. <br /> <br />3 o <br /> <br />A letter of credit or performance bond by a lender of surety <br />acceptable to the County shall be made out to Cabarrus County in <br />the amount of 125% of the costs determined in step 2 above. <br /> <br />4. The final map of the subdivision shall be approved and recorded. <br /> <br />Prior to the reduction or release of the 125% amount required in step 3 above <br />for completion of improvements(s), the following information must be provided <br />when applicable: <br /> <br />Proof satisfactory to the County that the applicable improvement(s) <br />has been made to the required specifications. <br /> <br />2 o <br /> <br />Proof satisfactory to the County that payment in full has been made <br />to the applicable contractor and/or agency for the improvement(s). <br /> <br />Upon proof of completion satisfactory to the County, of the required <br />improvement(s), the amount that had been required for that improvement(s) may <br />be released from the total amount required. The total amount of the letter of <br />credit or bond for required improvements may be released when all improvements <br />are complete, and the above information has been provided. The County may <br />employ a consulting engineer to review requests for full or partial releases. <br />The applicant shall be responsible for all costs associated with the outside <br />engineering review. <br /> <br />Section 16. Reservation of School Sites <br /> <br />Schools sites must be reserved within the agreement of the Board of Education, <br />in accordance with adopted plans of the Planning and Zoning Con~nission and/or <br />Cabarrus County Board of Commissioners. Whenever a subdivision includes all or <br />part of a site identified for new school construction, the Board of Education <br />will be notified. That Board shall then notify the Planning and Zoning <br />Commission whether it still wishes the site to be reserved. If the Board of <br />Education does not wish for it to be reserved, no reservation will be required. <br />If that board wishes for the site to be reserved the subdivision may not be <br />approved without that reservation. The Board of Education must acquire the <br />site within 18 months of the date of reservation. If the Board of Education <br />has not acquired the site or begun the proceedings to conden%n the site within <br />the 18 months, the land is freed of the reservation. <br /> <br />Section 17. Adequate Public Facilities Standards <br /> <br />To ensure public health, safety and welfare the Planning and Zoning Commission <br />shall review each subdivision, multi-family development, and mobile home park <br />to determine if public facilities are adequate to serve that development. <br /> <br />The public facilities to be considered include, but are not limited to schools, <br />fire and rescue, law enforcement and other county facilities. Applicable state <br />standards and guidelines shall be followed for determining whether facilities <br />are adequate. Facilities must be in place or programmed to be in place within <br />two years of the preliminary approval to be considered adequate. The Planning <br />and Zoning Commission may grant partial approval of developments based on <br />limited adequacy. <br /> <br />CN3%PTER 5 RECREATIONAL ~REAS <br /> <br />Section 1 Miniparks--Required <br /> <br />Ail residential development consisting of 30 or more lots or units, whichever <br />is greater, shall provide active recreational areas in the form of miniparks in <br />an amount equal to at least .0050 acres (218 square feet) per person per unit. <br />"Per person per unit" will be computed using 1990 Census data for the census <br />tract within which a development is located. To illustrate, if a subdivision <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.