My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BC 2004 07 26
CabarrusCountyDocuments
>
County Clerk
>
MEETING MINUTES
>
Board of Commissioners
>
2004
>
BC 2004 07 26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2006 10:14:22 PM
Creation date
8/30/2004 10:33:59 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
7/26/2004
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 26, 2004 Page 575 <br /> <br />(F-17) Revised Construction Standards Fee Schedule <br /> <br /> The fee schedule for Construction Standards was amended in May with an <br />effective date of July 1, 2004. The implementation of the new schedule <br />revealed inconsistencies between some of the specific schedules and some <br />minor items were not covered. The proposed revisions will eliminate those <br />inconsistencies and address the additional permit types that have been <br />identified. <br /> <br /> UPON MOTION of Commissioner Carpenter, seconded by Acting Chairman <br />Carruth and unanimously carried, the Board adopted the following fee <br />schedules for Construction Standards effective July 1, 2004: <br /> <br />CABARRUS COUNTY CONSTRUCTION STANDARDS <br />FEE SCHEDULES <br /> EFFECTIVE JULY 1, 2004 <br /> <br />SCHEDULE A - NEW CONSTRUCTION <br /> <br />General <br /> Value of Construction <br /> <br />Permit Fee <br /> <br />$ 0 - $15,000 $ 75.00 <br />15,001 - 25,000 113.00 <br />25,001 - 40,000 176.00 <br />40,001 - 50,000 218.00 <br /> <br />Estimated construction cost above $50,000 will be charged an <br />additional $3.00 per additional $1,000.00 building value. <br /> <br />*Estimated cost for residential construction will be based on the <br />total cost of construction or $55.00 per square foot of heated <br />space and $25.00 per square foot of unheated space whichever is <br />greater. A $10.00 surcharge will be added to these permits as <br />required by the "Homeowners Recovery Fund". <br /> <br />Other new construction fees: <br /> <br />Mobile Home $100.00 <br />Daycare/Group Care/Foster Care Home Inspection $100.00 <br />Temporary Construction Trailer Permit $100.00 <br />Replacement Building Permit Cards $ 3.00 <br /> <br />PLAN REVIEW AND GENERAL POLICY <br /> <br />Plan Review - $50.00 base fee plus .03/square foot <br /> <br />Callback Fee - A $50.00 callback fee will be charged for re- <br />inspection for any return trip to a site due to owner, contractor <br />or sub-contractor being unprepared for the original inspection. <br /> <br />Other building permit fees: <br /> <br />Special event tents (for religious, exhibition, political, <br />secular, amusement or commercial purposes) - $25.00 per tent. <br /> <br />Certificate of Occupancy for Existing Buildings - $20.00. <br />(For businesses who locate in an existing commercial building <br />where no construction occurs in preparation to operate the <br />business. This Certificate of Occupancy shall be issued only <br />after approval from the applicable zoning, building inspection, <br />fire, health, engineering and state agencies having <br />jurisdiction). <br /> <br />SCHEDULE B <br /> <br />Building permit for the alteration, demolition, remodel, removal, <br />repair, re-roofing, or reconstruction of any structure. This <br />schedule also applies to accessory buildings. <br /> <br />Value of Construction <br /> <br />Permit Fee <br /> <br />$ 0 - $ 1,000 $25.00 <br /> 1,001 - 5,000 35.00 <br /> 5,001 - 15,000 75.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.