My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015_12_01
>
Meeting Minutes
>
2015
>
2015_12_01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2016 12:47:07 PM
Creation date
1/27/2016 12:47:02 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
12/1/2015
Board
Soil and Water
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for the CWMTF grant. Finally, Kelly updated the Board that <br />the Peach Orchard Estate Conservation Easement violations <br />had been addressed by the Grantee and would be field <br />verified by Daniel. <br />(4 -A -ii) Capital Improvement Projects <br />Kelly informed the Board that Capital Improvement Projects <br />have been submitted on behalf of the Cabarrus Soil and <br />Water Conservation District. Our top priority project is <br />the acquiring of the Newcomer property bordering our <br />Conservation Field School, and the development of <br />infrastructure on that property for student field trips. <br />(4 -A -iii) Recommendations on a Seed Drill Policy <br />Daniel updated the Board on the revenues and expenses to <br />date pertaining to the Seed Drill account. He also provided <br />a draft of a new Seed Drill Policy which would restrict use <br />of the drill to Cabarrus and adjacent counties. The Board <br />commented that additional changes could be made to the <br />policy, such as adding a restriction on the speed at which <br />the drill could be pulled as well as a statement that only <br />allowed farmers to rent the drill for one weekend at a <br />time. <br />(4 -A -iv) Cox Mill School Update <br />Erin updated the Board that the violations of the CCAP <br />contracts on the campus of Cox Mill Elementary School had <br />been addressed by the CCS grounds management. The County is <br />collaborating with CCS to dicuss plans for addressing the <br />pipe which violates the Conservation Easement on that same <br />campus. CSWCD Staff sent the notification letter regarding <br />this violation earlier this month. <br />(4 -A -v) Storage Building Update <br />Erin updated the Board that the storage building outside of <br />the CSWCD offices would be removed and not replaced due to <br />potential future plans for the same site. CSWCD Staff will <br />consolidate materials currently stored in the building and <br />move most of it to off -site storage. Frequently used <br />materials will be stored in the office. <br />
The URL can be used to link to this page
Your browser does not support the video tag.