Laserfiche WebLink
CHANGE NOTICE <br /> CCN# 4 <br /> Edison Foard Date: 12/15/2016 <br /> Project Name: Kannapolis Middle School <br /> Project Number: Kannapolis Middle School <br /> Page Number: <br /> Client Address: <br /> Work Description <br /> This is a cost for RFI-121 adding 11-Quad outlets and 11-Data stubs for TID'S not shown on eiectricai prints. We reserve the <br /> right to correct this quote for errors and omissions. <br /> This quota covers direct costs only and we reserve the right to claim for impact and consequential costs. <br /> This price is good for acceptance within 10 days from the date of receipt. <br /> We request a time extension of 3 days. <br /> We will supply and install all materials,labor,and equipment as per your instructions on CCN#4. <br /> Itemized Breakdown <br /> Description Qty Trade Price Net Price Labor Total Mat. <br /> 314"CONDUIT-EMT 275 49.00 49.00 4.40 134.75 <br /> 314"CONN S'S STL-EMT 44 18645 186.45 12.50 82.04 <br /> 3/4"COUPLING SS STL-EMT 66 219.12 219.12 0.00 144.62 <br /> #12 THHN BLACK 561 149.00 149.D0 6.44 83.59 <br /> #12 THHN GREEN 187 149.00 149.00 6.44 27.86 <br /> WIRE CONN RED 33 16,16 16.16 7.50 5.33 <br /> 1G MSNRY BOX 3 112"DEEP 11 789.00 789.00 43.75 86.79 <br /> 2G MSNRY BOX 3 112"DEEP 11 805.00 805.00 43.75 88.55 <br /> GROUND SCREW W1 INSUL#12 LEAD 11 254.22 254.22 3.75 27.96 <br /> 2G DUPLEX REC PLATE-PLASTIC IVY 11 143.60 143.60 4.88 15.80 <br /> 20A 125V DUP RE(;-IVY(SG) 22 810.120 810.00 25.00 178.20 <br /> Totals 1,232 875.49 <br /> Description Qty Total Hrs. Material Con <br /> 3/4"CONDUIT-EMT 275 12.10 Normal <br /> 3/4"CONN SS STL-EMT 44 5.50 Normal <br /> 3/4"COUPLING SS STL-EMT 66 0.00 Normal <br /> #12 THHN BLACK 561 3.61 Normal <br /> #12 THHN GREEN 187 1.20 Normal <br /> WIRE CONN RED 33 2.48 Normal <br /> ORIGINAL <br /> G-6 Page 243 <br />