My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2017 09 18
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2017
>
AG 2017 09 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2017 3:18:30 PM
Creation date
11/27/2017 10:30:29 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/18/2017
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pp <br /> I C i Horn torn Page 4 <br /> Up to two (2) OPCCs will be developed from these preliminary plans to compare the two utility route <br /> options for the Client's review. This OPCC should be used only to establish an order of magnitude for <br /> the construction cost and should not be relied upon for budgetary decision making purposes. Because <br /> we do not control the cost of labor, materials, equipment or services furnished by others, methods of <br /> determining prices, or competitive bidding or market conditions, any opinions rendered as to costs, <br /> including but not limited to opinions as to the costs of construction and materials, shall be made on the <br /> basis of its experience and represent itsjudgment as an experienced and qualified professional,familiar <br /> with the industry. Kimley-Horn cannot and does not guarantee that proposals, bids or actual costs will <br /> not vary from its opinions of cost. <br /> For review, the Client will receive PDF copies of the Preliminary Site Plan, Utility Plan and OPCCs as <br /> the deliverable for this task. Up to one (1) round of revisions to the deliverables will be provided under <br /> this task. <br /> Additional Services <br /> Any services not specifically provided for in the above scope will be billed as additional services and <br /> performed at our then current hourly rates. Additional services we can provide include, but are not <br /> limited to, the following: <br /> • Topographic and ALTA Survey <br /> • Full Site Due Diligence <br /> • Environmental Site Investigations <br /> • Geotechnical Assessments <br /> • Full civil engineering design and permitting <br /> • Stormwater detention or treatment design <br /> • Construction Drawings and project specifications <br /> • Other Client-directed services excluded from tasks listed above <br /> Information Provided By Client <br /> We shall be entitled to rely on the completeness and accuracy of all information provided by the Client. <br /> The Client shall provide all information requested by Kimley-Horn during the project, including but not <br /> limited to the following: <br /> • Topographic and ALTA Survey, if available. <br /> • Available GIS information for the property. <br /> • Existing entitlements completed for the property to date. <br /> Schedule <br /> We will provide our services as expeditiously as practicable to meet a mutually agreed upon schedule. <br /> The scope and fee contained herein is based on a project duration of three (3) months from the time of <br /> authorization. Delays to the project schedule that extend the duration could result in additional fees. <br /> kimley-horn.com 11 South Tryon Street, - 200 Charlotte, North Carolina 1 2 number 2\n <br /> F-1 Page 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.