Laserfiche WebLink
UNIT PRICES: <br /> The following unit prices shall be used for adjustments in the contract price at the Owner's discretion.Items and <br /> quantities shown on drawings are to be included in the Base Bid and shall be used as the basis for establishing these <br /> unit prices.Refer to DIVISION 1 —GENERAL REQUIREMENTS, Section 012200"Unit Prices". <br /> Item Price/Unit Quantity in Base <br /> Bid <br /> UP-1 Unsuitable Soil Excavation and Replacement with <br /> Suitable ,00 <br /> Suitable Offsite Fill per c.y. 1,000 C.Y. <br /> UP-2 Import,Place and Compact Offsite Fill ao.06 per c.y. 500 c.y. <br /> UP-3 Mass Rock Excavation and Removal Offsite JtJ5.0 0 per c.y. 100 C.Y. <br /> indicated on <br /> 60 r p p drawings plus <br /> UP-4 Additional Mild Reinforcement Material ' b er]b. 5,000 lbs. <br /> indicated on <br /> drawings plus <br /> UP-5 Additional Post-Tensioning 61 .90 per lb. 1,000 lbs. <br /> UP-6 Horn/Strobe Device I GO per device indicated on <br /> drawings <br /> q <br /> UP-7 Temporary Fencing I #00 per 11 zero <br /> UP-8 Pressure Epoxy Injection Qr 00 per l.f. 5001.f. <br /> UP-9 Auger Cast-In Place Piles (3 K6 . OO per 11 indicated on <br /> drawings <br /> The undersigned understands that time is of the essence and agrees to the Contract Time and Liquidated Damages as <br /> specified herein,in the AIA Document A 101 Owner/Contractor Agreement as amended by the Owner and in AIA <br /> Document A201,General Conditions of the Contract for Construction,2007 Edition,as amended by the Owner. <br /> Accompanying this proposal are the following items: <br /> - Bid Security in the amount of 5%of the Contract Sum as required by North Carolina General Statue. <br /> - Required MBE Documentation <br /> The undersigned further agrees that this proposal shall be valid for a period of ninety(90)days from the date of <br /> receipt of the bids and that if this proposal is accepted by the Owner within this period,the Bidder will execute the <br /> Owner/Contractor Agreement form AIA A101-2007"Standard Form of Agreement Between Owner and <br /> Contractor"and provide surety bonds as described in the General Conditions of the Contract and meet the <br /> requirements of the North Carolina General Statutes. <br /> The undersigned further agrees to begin the Work promptly upon receipt of Notice to Proceed and to pursue the <br /> Work with an adequate work force to complete the Work within Three Hundred Sixty-Five(365)consecutive <br /> calendar days from the issuance of the written Notice to Proceed anticipated on January 8,2018.In accordance to <br /> AIA Document A201 General Conditions § 8.3.5,the undersigned shall be liable for and pay to the Owner the sum <br /> of$1,000.00 per calendar day as Liquidated Damages and not as a penalty,for each additional calendar day required <br /> to achieve Substantial Completion beyond the time period stated herein. <br /> The undersigned certifies that neither he,nor any official,agent or employee of the bidder has entered into any <br /> agreement,participated in any collusion,or otherwise taken any action which is in restraint of free competitive <br /> bidding in connection with this bid. <br /> GENERAL CONTRACT BID FORM OOAUTTent number 3\n <br /> G-7 Page 3157 <br />