Cabarrus County Commercial Building Plan Review Summary
<br /> Begin Date: 91112017 through End Date: 913012017
<br /> BU2017-02508 9/12/2017 8915 CHRISTENBURY PKWY Blaze Pizza Christenbury Corners Commercial interior upfit of a virgin shell for a fast casual pizza restaurant. $1,400,OOOI 1,815
<br /> CONCORD, NC 28027 lSpace will include a commercial kitchen, seating area, serving line and
<br /> restrooms.
<br /> BU2017-02511 9/12/2017 11303 MOORESVILLE RD Emerson Branch Installing a microwave dish to the existing cell tower $0 0
<br /> DAVIDSON, NC 28036
<br /> BU2017-02513 9/12/2017 2735 ODELL SCHOOL RD VERIZON TOWER-NC 73 Verizon will be adding a microwave dish to the existing cell tower. $0 0
<br /> CONCORD, NC 28027
<br /> BU2017-02514 9/12/2017 7965 LYLES LN NW At Home Store- Roof Recover Prepare existing roof membrane for roof recover system. Install new cover $0 0
<br /> CONCORD, NC 28027 board as separator between existing membrane and new membrane. Install
<br /> new single ply roof membrane.
<br /> BU2017-02516 19/12/2017 86 UNION ST S T abarrus County Parking Deck 80,000 square-foot cast-in-place concrete parking structure and associated $0 213,500
<br /> CONCORD, NC 28025 site work.
<br /> BU2017-02519 9/12/2017 8034 CONCORD MILLS BLVD Panera Bread#852 Remodel New interior finishes and furniture. New decorative lighting. New exterior $0 2,513
<br /> CONCORD, NC 28027 signage, patio furniture, and paint. New casework and layout adjustments
<br /> in front bakery. Update restroom lavatories,finishes and partitions.
<br /> BU2017-02520 9/12/2017 8111 CONCORD MILLS BLVD LOFT Outlet(Space#254)CONCORD MILLS y Refresh of existing store including storefront work and paint $0 5,202
<br /> CONCORD, NC 28027
<br /> BU2017-02523 9/12/2017 5454 ROCKY RIVER RD Rocky River Elementary School Media Center DIRTT Adding 3 wall units to media center for segmented/specialized learning $240,000 0
<br /> CONCORD, NC 28025 WALLS
<br /> BU2017-02541 19/13/2017 5313 STOWE LN T-Mobile site#5CT0055 add antenna and fiber, upgrade equipment, no ground or electrical work $90,500 0
<br /> CHARLOTTE, NC 28262
<br /> BU2017-02554 9/13/2017 8905 CHRISTENBURY PKWY HEAVENLY CAKES COMPANY Commercial Upfit for a Nothing Bundt Cakes(National franchise)bakery. $0 1,600
<br /> CONCORD, NC 28027
<br /> BU2017-02563 19/14/2017 2401 WONDER DR NE MCDONALDS WALL SIGN $20,000 0
<br /> CONCORD, NC 28083
<br /> BU2017-02569 9/14/2017 530 KANNAPOLIS PKWY Kay Jewelers-KANNAPOLIS PKWY Interior TI permit,with exterior bollards proposed $0 2,000
<br /> CONCORD, NC 28027
<br /> BU2017-02570 9/14/2017 4393 WEDDINGTON RD Dance Expressions RENOVATION OF EXISTING RESIDENTIAL STRUCTURE AND NEW $0 3,000
<br /> CONCORD, NC 28027 ADDITION TO ACCOMODATE A DANCE INSTRUCTION STUDIO;
<br /> BUILDING PLANS ONLY-SITE
<br /> INFORMATION WILL BE SUBMITTED UNDER A SEPARATE PACKAGE
<br /> BU2017-02576 9/14/2017 150 N RESEARCH CAMPUS DR NCRC Standard Process 'The NCRC Standard Process upfit consist consists of the construction of an $0 9,708
<br /> KANNAPOLIS, NC 28081 interior upfit and finishes for office spaces, lab spaces, clinical spaces and
<br /> a couple large conference areas on the first floor of the Core Lab Building,
<br /> consisting of approximately+/-9,000 square feet
<br /> BU2017-02584 9/15/2017 1510 HOLDEN AVE SW CCS URGENT NEED: Patriots Elm Mobile Unit Need 2 additional mobile unit classrooms to be added at PES $0 0
<br /> CONCORD, NC 28025 Classroom Additions 2017
<br /> BU2017-02591 9/15/2017 18 LAKE CONCORD RD NE THE FITTS COMPANY TWO MONUMENT SIGNS FOR FIRST CITIZEN BANK $10,000 0
<br /> CONCORD, NC 28025
<br /> BU2017-02594 9/15/2017 14556 US HWY 601 S �ASRS Addition 'The project is the ASRS Expansion. The addition will consist of a new steel $0 7,438
<br /> MIDLAND, NC 28107 structure with new insulated metal panel walls, roofing system, doors,fire
<br /> protection, mechanical, site work, and electrical power and lights. A new
<br /> fire wall portion of the project(not included in this submittal)to subdivide
<br /> the existing building will be required prior to final occupancy.
<br /> Attachment number 2\n
<br /> PlanReviewSummary 101212017 8:30:38 AM 2 of 4
<br /> 1-3 Page 231
<br />
|