Laserfiche WebLink
Cost Estimate for new Early College <br />Buildings $ 289,420.00 <br />10 Plex, 10,360 sgft $ 211,820.00 <br />4 Plex, 2,400 sgft - 2 @ $38,500 each $ 77,600.00 <br />Electrical Service and Wiring for New Structures $115,000.00 <br />10 Plex Classroom Unit $ 45,000.00 <br />4 Plex Admin Facility $ 35,000.00 <br />4 Plex Dining Facility $ 35,000.00 <br />Water and Sewer for New Structures $ 55,540.00 <br />2 inch Water Tap $ 8,500.00 <br />6 inch Sewer Tap $ 6,040.00 <br />Capital Recovery (one Time Fee) $ 11,000.00 <br />500 feet of 2 inch water line, 200 feet of six inch <br />Sewer Line, 2 inch back flow w /cover, and 10 <br />additional fixtures $ 30,000.00 <br />Fire Alarm $ 15,000.00 <br />Phone $ 10,000.00 <br />Decks, Ramps, Awnings $ 65,000.00 <br />Sidewalks $ 25,000.00 <br />Subtotal $ 574,960.00 <br />F -1 <br />Attachment number 1 \n <br />Page 51 <br />