My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2016 08 15
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2016
>
AG 2016 08 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2016 3:37:35 PM
Creation date
11/27/2017 10:34:33 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/15/2016
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimate Company Standard Estimate Report Page 3 <br />15-2189 Royal Oaks PCO 01 6/612016 4:29 PM <br />Mern <br />D— option <br />''?"���+. ri <br />On.. A.1omob2e <br />1611 <br />Comparry EqulP —rit <br />Name Anted Amount <br />10 Superi t.Went Trick <br />N <br />Company Equipment, <br />1515 <br />Rental Equipment <br />- - <br />10 Rental Equipment <br />1.440 <br />RWr IEquip —t <br />1620 <br />Small Tool <br />n <br />10 smell Tool <br />000 <br />8maM Tonle <br />1625 <br />06 8 Gas <br />900 <br />20 offend Gas <br />500 <br />OR 3 Gas <br />GENERAL REQUIREMENTS <br />200 <br />973.33 Labor hours <br />2206 <br />SfTE DEVELOPMENT <br />2201 <br />survayik Lay Out <br />- 60.00 AA. <br />10 SurveyOg <br />S s Lay ou< <br />2220 <br />EarNnvk: Site l Din <br />0; C pdirg <br />EartMAc: SM. ! Dirt <br />2610 <br />A phalt Paving <br />n <br />01 Aephaft Paving - Sula —baeL <br />AsphaB Paving <br />2523 <br />sidmalka E Mlso. Concrat <br />10 Sidowalk4'Stmtdard <br />Sidevralk! 8 ifs.. Con—t <br />2500 <br />Storm Drainage <br />CS Storm Drainage SuXYC —tm <br />storm Drainage <br />2565 <br />site water syst.n. <br />10 W.- Sub.onbmai r <br />sit. water Systems <br />2836 <br />5ft FtrnishSnga <br />15 Me Rw* <br />SBe Fterda:lings <br />2900 <br />Larrdeefplrr9 <br />20 L4sbcwqrg Subwntraratr <br />L.mdscapirg <br />17a1—if Qty Unit Cost <br />4.00 wk <br />1.00 mo <br />11x1 mn <br />4.00 wks <br />I. D is <br />1 00 Is <br />100 IS <br />39G.00 of <br />1.00 Is <br />1.00 Is <br />9 -DO ue <br />1.00 Is <br />`. " <br />0 <br />0 <br />''?"���+. ri <br />`r?1+ <br />Amount Unit Cwt <br />Amount A—t <br />Name Anted Amount <br />Amount <br />N <br />1.782 <br />480 <br />430 <br />- - <br />- - <br />1.440 <br />1440 <br />- -- - 1,440 <br />- - <br />4 <br />0 <br />1A40 <br />- <br />000 <br />1,635 <br />50 <br />500 <br />900 <br />1,635 23,529 <br />500 <br />500 <br />200 <br />200 <br />206 <br />200 <br />- 60.00 AA. <br />200 - <br />200 <br />200 <br />200 <br />11460 300 350 500 5,090 19,700 <br />3000 <br />0 <br />0 <br />D- <br />N 3005 <br />Division 3 Subcontractors <br />0 <br />s <br />0 <br />3 <br />12.472 <br />N <br />1.782 <br />7 <br />1.782 <br />CONCRETE <br />0 <br />- - <br />4 <br />0 <br />900 18187 lea <br />- <br />000 <br />1,635 <br />9,215 <br />900 <br />1,635 23,529 <br />3000 <br />SITE DEVELOPMENT <br />CONCRETE <br />D- <br />N 3005 <br />Division 3 Subcontractors <br />0 <br />s <br />1 (" f .Ie <br />3 <br />Division 35ul— nfraators <br />N <br />7 <br />CONCRETE <br />3 <br />l <br />1.00 Is - - - - —_ <br />22.W5 <br />0 0 22, 885 <br />0 <br />0 <br />0 <br />O <br />0 <br />0 <br />12.472 <br />1 ;472 <br />1,782 <br />1,702 <br />0 <br />0 <br />0 <br />9 <br />— ZAM <br />2,535 <br />9,275 <br />9,275 <br />0 26,064 <br />- 22.685 <br />22,0&5 <br />0 22,885 <br />5 G -3 Page 186 <br />
The URL can be used to link to this page
Your browser does not support the video tag.