Laserfiche WebLink
IL <br />Attachment number 1 \n <br />G -3 Page 198 <br />CHANGE ORDER PROPOSAL BREAKDOWN <br />UNIVERSAL STEEL of NC, LLC JOB NAME: Royal Oaks Elementary School <br />630 Bassett Dr THOMASVILLE, NC JOB NUMBER: 1607 <br />PH: 336 476 - 3105 FAX 336 - 476 - 8995 CONTRACTOR: Edison Foard <br />DATE: May 24, 2016 <br />DESCRIPTION OF WORK: <br />CHANGE PROPOSAL <br />CP-01 <br />REFER TO: <br />JOB TAXED: <br />7.00% <br />PM: <br />WP <br />Changes due to PCO#1 Addenda 4 release. <br />i� <br />PRIMARY STEEL <br />SHOP LABOR <br />HOURS: <br />RATE/PER HR. <br />DESCRIPTION: <br />TOTAL COST: <br />REGULAR <br />0 <br />$ <br />60.00 <br />$ <br />OVERTIME <br />0 <br />$ <br />68.00 <br />$ <br />DETAILING LABOR <br />HOURS: <br />RATE/HR. <br />DESCRIPTION: <br />TOTAL COST. <br />STRUCT. PER/1-13.) <br />30 <br />$ <br />70.00 <br />Additional detailing to previously completed drawings. <br />$ <br />2,100.00 <br />ENGINEERING <br />17 <br />$ <br />85.00 <br />Additional engineering of connections for changed loading. <br />$ <br />1,485.00 <br />ADDITIONAL COSTS <br />UNIT <br />RATE <br />DESCRIPTION: <br />TOTAL COST. <br />[ j.j <br />PAINTING PER /TON <br />0 <br />$ <br />25.00 <br />Painting of additional or changed steel. <br />$ <br />- <br />11 <br />GALVANIZING PER. / LB. <br />0 <br />$ <br />0.60 <br />$ <br />3. <br />FREIGHT <br />0 <br />$ <br />650.00 <br />S hling for additional steel. <br />$ <br />- <br />4. <br />JOIST 8 MISC. <br />1 <br />1 $ <br />2,040.00 <br />Joist added. <br />$ <br />2,040.00 <br />5. <br />DECK & MISC. <br />1 <br />1 $ <br />400.00 <br />Deck added. <br />$ <br />400 00 <br />6. <br />BUYOUTS <br />0 <br />$ <br />_ <br />DESCRIPTION OF MAT'L. <br />UNIT PRICE <br />QUANT. <br />FASTENERS= = = = = == <br />$ 3.00 <br />0 <br />$ <br />1. <br />A36 / A50 STEEL <br />$ 0.85 <br />0 <br />$ <br />2. <br />TUBE <br />$ 1.10 <br />0 <br />$ <br />- <br />3. <br />PIPE <br />$ 1.05 <br />0 <br />$ <br />- <br />4. <br />ROLLED MATERIAL <br />$ 1.40 <br />0 <br />$ <br />5. <br />MISC. ITEMS <br />$ - <br />0 <br />$ <br />_ <br />6. <br />MISC. ITEMS <br />$ <br />0 <br />$ <br />MISC. STEEL <br />SHOP LABOR <br />HOURS: <br />RATE/PER HR. <br />DESCRIPTION: <br />TOTAL COST. <br />REGULAR <br />200 <br />$ <br />60.00 <br />Added stair and railing fabrication by misc. fabricator. <br />$ <br />12,000.00 <br />OVERTIME <br />0 <br />$ <br />68.00 <br />$ <br />_ <br />DETAILING LABOR <br />HOURS: <br />RATEIPER LB. <br />DESCRIPTION: <br />TOTAL COST: <br />MISC. PER / LB. <br />40 <br />$ <br />70.00 <br />Detailing for the additional stair and railing. <br />$ <br />2,800.00 <br />ENGINEERING <br />16 <br />$ <br />85.00 <br />Engineering for the additional stair. <br />$ <br />1,360.00 <br />ADDITIONAL COSTS <br />UNIT <br />RATE <br />DESCRIPTION: <br />TOTAL COST: <br />1. <br />PAINTING PER /TON) <br />11 <br />$ <br />25.00 <br />Painting of additional steel stair and railing- <br />$ <br />275.00 <br />2. <br />GALVANIZING PER. / LB. <br />0 <br />$ <br />0.60 <br />$ <br />- <br />3.) <br />FREIGHT <br />1 <br />$ <br />650.00 <br />Shipping for the additional stair and railing. <br />$ <br />650.00 <br />DESCRIPTION OF MAT'L. <br />UNIT PRICE <br />QUANT. <br />FASTENERS= = = = = == <br />Fasteners for the additional stair. <br />$ 3.00 <br />100 <br />$ <br />300.00 <br />1. <br />A36 / A50 STEEL <br />Raw material for the additional stair. <br />$ 0.85 <br />8500 <br />$ <br />7,225.00 <br />2. <br />TUBE <br />$ 1.10 <br />0 <br />$ <br />- <br />3. <br />PIPE <br />Raw material <br />for the additional railing. <br />$ 1.05 <br />2040 <br />$ <br />2,142.00 <br />4. <br />ROLLED MATERIAL <br />$ 1.40 <br />0 <br />$ <br />- <br />TAX 7.00% <br />FABRICATION SUB - TOTAL------------ - - - - -- <br />$ <br />866.74 <br />$ <br />33,643.74 <br />Continued on page 2 <br />Attachment number 1 \n <br />G -3 Page 198 <br />