My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2016 08 15
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2016
>
AG 2016 08 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2016 3:37:35 PM
Creation date
11/27/2017 10:34:33 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/15/2016
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N e i lsoft <br />1315 Butterfield Road, Suite 204 <br />PH <br />(630) 357 -7430 <br />Downers Grove, IL 60515 <br />FAX <br />(630) 357 -7485 <br />Fabricator : <br />Universal Steel of NC, LLC <br />Fabricator <br />Job #: <br />1607 <br />Project : <br />Royal Oaks Elementary School <br />Neilsoft <br />Pro ect #: <br />16 -17 GIIP 003 <br />CO Date: <br />05/19/16 <br />CHANGE ORDER #01 <br />Change Order Reason IPCO 1 Revised drawings Received 5/5/16 <br />ADDITIONAL DOCUMENT <br />Revision <br />Description of changes /List of steel members affected <br />S1.4 - Foundation Plan - Part D <br />Grid line dimensions, column locations revised, Anchor bolts revision. <br />S1.5- Foundation Plan - Part E <br />Grid line dimensions, column locations revised, Anchor bolts revision. <br />S2.1 -Upper Level Framing Plan - <br />Part B <br />Grid dimensions & Steel framing revised for part-B, Anchor bolts <br />revision. <br />S2.2 -Upper level Framing Plan <br />Part D <br />Grid dimensions &Steel framing revised for part -D <br />S2.2 -Upper level Framing Plan - <br />Part D <br />Canopy steel added West of grid D1 & North of DA between D4.7- <br />D5.2 <br />S2.6 -Low Roof Framing Plan - Part <br />D <br />Grid dimensions & Steel framing revised for part-D <br />S2.7 -Low Roof Framing Plan - Part <br />E <br />Dimensions & Steel framing revised for part-E <br />S2.10 -High Roof Framing Plan -Part <br />D <br />Dimensions & Steel framing revised for part-D <br />S3.1- Typical Foundation Details <br />Base plate schedule updated, column base & anchor bolt pattern <br />revised <br />S5.1- Braced Frame Elevations <br />Brace bay framing & Connection design updated, framing will be <br />S5.2- Braced Frame Elevations <br />Brace bay framing & Connection design updated, framing will be <br />TOTAL VALUE OF THIS CHANGE ORDER = <br />$2,100 <br />TOTAL VALUE OF PREVIOUSLY APPROVED CHANGE ORDERS <br />$0 <br />TOTAL CHANGE TO CONTRACT AMOUNT <br />$2,100 <br />Schedule Impact In Days ( 5 Business Days = One Week) One Week <br />APPROVAL <br />NAME <br />SIGNATURE <br />DATE <br />Attachment number 1 \n <br />G -3 Page 200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.