Laserfiche WebLink
§ 10.7 The Architect shall have the right to include photographic or artistic representations of the design of the <br />Project among the Architect's promotional and professional materials. The Architect shall be given reasonable <br />access to the completed Project to make such representations. However, the Architect's materials shall not include <br />the Owner's confidential or proprietary information if the Owner has previously advised the Architect in writing of <br />the specific information considered by the Owner to be confidential or proprietary. The Owner shall provide <br />professional credit for the Architect in the Owner's promotional materials for the Project. <br />§ 10.8 If the Architect or Owner receives information specifically designated by the other party as "confidential" or <br />"business proprietary," the receiving party shall keep such information strictly confidential and shall not disclose it <br />to any other person except to (1) its employees, (2) those who need to know the content of such information in order <br />to perform services or construction solely and exclusively for the Project, or (3) its consultants and contractors <br />whose contracts include similar restrictions on the use of confidential information. <br />ARTICLE 11 COMPENSATION <br />§ 11.1 For the Architect's Basic Services described under Article 3, the Owner shall compensate the Architect as <br />follows: <br />(Insert amount of or basis for; compensation.) <br />A total lump sum fee of Eight Hundred Two Thousand dollars ($802,000.00) <br />§ 11.2 For Additional Services designated in Section 4. 1, the Owner shall compensate the Architect as follows: <br />(Insert amount of or basis for, compensation. If necessary, list specific services to which particular methods of <br />compensation apply) <br />As mutually agreed upon by the parties. <br />§ 11.3 For Additional Services that may arise during the course of the Project, including those under Section 4.3, the <br />Owner shall compensate the Architect as follows: <br />(Insert amount of or basis for, compensation) <br />As mutually agreed upon by the parties. <br />§ 11.4 Compensation for Additional Services of the Architect's consultants when not included in Section 11.2 or <br />11.3, shall be the amount invoiced to the Architect plus twenty percent (20 %), or as otherwise stated below: <br />§ 11.5 Where compensation for Basic Services is based on a stipulated sum or percentage of the Cost of the Work, <br />the compensation for each phase of services shall be as follows: <br />Schematic Design Phase <br />Design Development Phase <br />Construction Documents <br />Phase <br />Bidding or Negotiation Phase <br />Construction Phase <br />Total Basic Compensation <br />twenty <br />percent ( <br />20 <br />%) <br />twenty <br />percent ( <br />20 <br />%) <br />thirty <br />percent ( <br />30 <br />%) <br />five <br />percent ( <br />05 <br />%) <br />twenty-five <br />percent ( <br />25 <br />%) <br />one hundred percent ( 100 %) <br />§ 11.6 When compensation is based on a percentage of the Cost of the Work and any portions of the Project are <br />deleted or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent <br />services are performed on those portions, in accordance with the schedule set forth in Section 11.5 based on (1) the <br />lowest bona fide bid or negotiated proposal, or (2) if no such bid or proposal is received, the most recent estimate of <br />the Cost of the Work for such portions of the Project. The Architect shall be entitled to compensation in accordance <br />with this Agreement for all services performed whether or not the Construction Phase is commenced. <br />AIA Document B701 TM — 2007 formerly B151 TM — 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights <br />Init. reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution 16 <br />of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maxi rry}{gr " <br />� p �511�1 <br />t under the law. This document was produced by AIA software at 09:14:42 on 11/08/2016 under Order No.7362255683_1 which expires on a d `is"�r 2 \n <br />not for resale. <br />User Notes: G_6 Pa e(1684698433) <br />g <br />