Laserfiche WebLink
BU2016 <br />-02880 <br />10/11/2016 <br />COMMERCIAL UPFIT <br />198 JAYCEE RD <br />CONCORD, NC 28025 <br />MIDLAND, NC 28107 <br />BU2016 <br />-02966 <br />KANNAPOLIS, NC 28083 <br />BU2016 <br />-02890 <br />10/13/2016 <br />modifi cations, electrical modifications and new finishes <br />83 MCCACHERN BLVD <br />BU2016 <br />-02971 <br />10/20/2016 <br />1045 NORTHEAST GATEWAY C7 <br />CONCORD, NC 28025 <br />BU2016 <br />-02892 <br />10/13/2016 <br />BU2016 <br />212 LE PHILLIP CT <br />10/20/2016 <br />2139 SUPPLY CT <br />building shell permit submittal , not up -fit. No space classifications are changed <br />CONCORD, NC 28027 <br />CONCORD, NC 28025 <br />BU2016 <br />-02941 <br />10/18/2016 <br />�McDonalds Arch is being moved to the right above the In -Store Unit windows. <br />5011 WEDDINGTON RD <br />The remediation of overcurrent protective devices found to have inadequate <br />BU2016 <br />short ci rcuit cu rrent ratings. <br />Finnord North America Group <br />CONCORD, NC 28027 <br />BU2016 <br />-02942 <br />10/18/2016 <br />and branch circuits will be provided as detailed in the provided Electrical <br />16270 BAYFIELD PKWY <br />Drawings. <br />Rider Transit Center Upfit <br />Upfit to existing administrative spaces, including: ticketing area, break room, <br />CONCORD, NC 28027 <br />BU2016 <br />-02943 <br />10/18/2016 <br />2625 BETHLEHEM CHURCH RD <br />Remediation of overcurrent protective devices found to have inadequate short <br />circuit cur rent ratings. <br />GOLD HILL, NC 28071 <br />BU2016 <br />-02946 <br />10/18/2016 <br />470 COPPERFIELD BLVD <br />CONC ORD, NC 28025 <br />BU2016 <br />-02957 <br />10/19/2016 <br />ODELL SCHOOL RD <br />141 <br />CONCORD, NC 28027 <br />BU2016 <br />-02963 <br />10/19/2016 <br />13722 BILL MCGEE RD <br />MIDLAND, NC 28107 <br />BU2016 -02964 <br />10/19/2016 <br />5047 NC HWY 24 -27 <br />COMMERCIAL UPFIT <br />EDWARD JONES CONCORD <br />CONCORD, NC 28025 <br />MIDLAND, NC 28107 <br />BU2016 <br />-02966 <br />10/19/2016 <br />2420 SUPERCENTER DR <br />CONCORD, NC 2802 <br />_ <br />modifi cations, electrical modifications and new finishes <br />KANNAPOLIS, NC 28083 <br />BU2016 <br />-02971 <br />10/20/2016 <br />1045 NORTHEAST GATEWAY C7 <br />upfit existing office / warehouse to create 3 additional office areas <br />Burgundy Process Installation <br />Project is the process up -fit for a previously permitted shell (BU2016- 02193). <br />CONCORD, NC 2 8025 <br />BU2016 <br />_ <br />-02973 <br />10/20/2016 <br />2139 SUPPLY CT <br />building shell permit submittal , not up -fit. No space classifications are changed <br />CONCORD, NC 28027 <br />by this project from those in the shell permit. <br />CONCORD, NC 28027 <br />BU2016 -02974 <br />10/20/2016 <br />3600 S RIDGE AVE <br />COMMERCIAL UPFIT <br />EDWARD JONES CONCORD <br />CONCORD, NC 28025 <br />BU2016 -02977 <br />10/20/2016 <br />301 MEDICAL PARK DR <br />comme rcial cooking appliances or hood. <br />Anytime Fitness <br />CONCORD, NC 2802 <br />_ <br />modifi cations, electrical modifications and new finishes <br />_ 1 CONCORD, <br />IBU2016 -02978 <br />10/20/2016 <br />N <br />commercial upfit <br />8694 CONCORD MILLS BLVD <br />upfit existing office / warehouse to create 3 additional office areas <br />Burgundy Process Installation <br />Project is the process up -fit for a previously permitted shell (BU2016- 02193). <br />NC 28027 <br />BU2016 -02979 <br />10/20/2016 <br />8615 CONCORD MILLS BLVD <br />CONCORD, NC 28027 <br />building shell permit submittal , not up -fit. No space classifications are changed <br />CONCORD, NC 28027 <br />15CT0083A <br />tower antenna addition; existing carrier <br />D S CONTRACTING <br />COMMERCIAL UPFIT <br />EDWARD JONES CONCORD <br />COMMERCIAL UPFIT <br />C3 Upfit <br />Upfit grey box into a coffee and ice cream shop. Establishment does not require <br />BU2016-02985 <br />comme rcial cooking appliances or hood. <br />Anytime Fitness <br />Interior non - structural demolition, new partitions, HVAC modifications, plumbing <br />modifi cations, electrical modifications and new finishes <br />5CT0467A <br />tower antenna addition <br />_ <br />Hanger Clinic <br />N <br />commercial upfit <br />ODELL A UPFIT <br />upfit existing office / warehouse to create 3 additional office areas <br />Burgundy Process Installation <br />Project is the process up -fit for a previously permitted shell (BU2016- 02193). <br />Includes installation of storage silos, manufacturing process, material conveying <br />systems and utility infrastructure. Sprinkler system and all partitions are part of <br />CONCORD, NC 28027 <br />building shell permit submittal , not up -fit. No space classifications are changed <br />-02987 <br />by this project from those in the shell permit. <br />CASCO SIGNS - Superior Distribution <br />One (1) 60" X 120" ground sign <br />THE SIGN CLINIC <br />�McDonalds Arch is being moved to the right above the In -Store Unit windows. <br />CHS Gateway PDR <br />The remediation of overcurrent protective devices found to have inadequate <br />BU2016 <br />short ci rcuit cu rrent ratings. <br />Finnord North America Group <br />Adding new 480/227V, 3Phase, 4W Electrical Service for new Production <br />Equipment. Existing Electrical Service is 208/120V. 3 Phase, 4W. Distribution <br />and branch circuits will be provided as detailed in the provided Electrical <br />BU2016 <br />Drawings. <br />Rider Transit Center Upfit <br />Upfit to existing administrative spaces, including: ticketing area, break room, <br />women's restroom, offices, conference room. Includes repair /replacement of <br />sections of existing sanitary waste line /plumbing. <br />CHS Concord Med Mall Protective Device Remediation <br />Remediation of overcurrent protective devices found to have inadequate short <br />circuit cur rent ratings. <br />Sleep Number <br />Flooring, paint, cashwrap, 8' shelving fixture install for new Sleep Number store. <br />Oreck Retail Store <br />minimal walls being built to create showroom space and back of house storage <br />BU2016 -02981 110/20/2016 113722 BILL MCGEE RD <br />MIDLAND. NC 28107 <br />BU2016 <br />-02983 <br />10/20/2016 <br />14700 US HWY 601 <br />MIDLAND, NC 28107 <br />BU2016-02985 <br />10/20/2016 <br />800 SEASONS PL <br />CONCORD, NC 28027 <br />BU2016 <br />-02986 <br />10/20/2016 <br />900 SEASONS PL <br />CONCORD, NC 28027 <br />BU2016 <br />-02987 <br />10/20/2016 <br />700 SEASONS PL <br />CONCORD, NC 28027 <br />BU2016 <br />-02988 <br />10/20/2016 <br />187 BUFFALO AVE <br />CONCORD, NC 28025 <br />BU2016 <br />-02990 <br />10/20/2016 <br />1215 S RIDGE AVE <br />I KANNAPOLIS, NC 28083 <br />burgunay vrocess instaiiation <br />LIGHTHOUSE CORNING PROJECT <br />SEASONS AT POPLAR TENT BUILDING #8 <br />area. One new office being built. Replace ceiling with new grid, tile and lights. <br />New electrical and new finishes. Existing ADA restroom to remain. <br />Project is the process up -fit for a previously permitted shell (BU2016- 02193). <br />Includes installation of storage silos, manufacturing process, material conveying <br />systems and utility infrastructure. Sprinkler system and all partitions are part of <br />building shell permit submittal , not up -fit. No space classifications are changed <br />by this project from those in the shell permit. <br />COMPLETION OF INTERIOR WALL BOARDS, CEILING AND FLOORING <br />INCLUDING INSTALLATION OF DOORS INTO EXISTING FRAMES. <br />NEW APARTMENTS <br />12 UNITS <br />FOOTINGS AND FO UNDATION ONLY <br />SEASONS AT POPLAR TENT BUILDING #9 NEW APARTMENTS <br />24 UNITS <br />FOOTINGS AND FOUNDATION ONLY <br />SEASONS AT POPLAR TENT BUILDING #7 NEW APARTMENTS <br />24 UNITS <br />FOOTINGS AND FOUNDATION ONL <br />T- Mobile site #5CT0162 187 BUFFALO Collocation on existing tower with equipment cabinet and 200 amp meter <br />South Ridge Mini Storage Add 2 additional buildings to the parcel <br />,900 <br />$0 <br />,800,000 <br />$0 <br />$0 <br />1 <br />14,400 <br />Plan ReviewSummary 11111201634421PM 2or3 <br />I -2 Page 284 <br />