BU2016
<br />-02880
<br />10/11/2016
<br />COMMERCIAL UPFIT
<br />198 JAYCEE RD
<br />CONCORD, NC 28025
<br />MIDLAND, NC 28107
<br />BU2016
<br />-02966
<br />KANNAPOLIS, NC 28083
<br />BU2016
<br />-02890
<br />10/13/2016
<br />modifi cations, electrical modifications and new finishes
<br />83 MCCACHERN BLVD
<br />BU2016
<br />-02971
<br />10/20/2016
<br />1045 NORTHEAST GATEWAY C7
<br />CONCORD, NC 28025
<br />BU2016
<br />-02892
<br />10/13/2016
<br />BU2016
<br />212 LE PHILLIP CT
<br />10/20/2016
<br />2139 SUPPLY CT
<br />building shell permit submittal , not up -fit. No space classifications are changed
<br />CONCORD, NC 28027
<br />CONCORD, NC 28025
<br />BU2016
<br />-02941
<br />10/18/2016
<br />�McDonalds Arch is being moved to the right above the In -Store Unit windows.
<br />5011 WEDDINGTON RD
<br />The remediation of overcurrent protective devices found to have inadequate
<br />BU2016
<br />short ci rcuit cu rrent ratings.
<br />Finnord North America Group
<br />CONCORD, NC 28027
<br />BU2016
<br />-02942
<br />10/18/2016
<br />and branch circuits will be provided as detailed in the provided Electrical
<br />16270 BAYFIELD PKWY
<br />Drawings.
<br />Rider Transit Center Upfit
<br />Upfit to existing administrative spaces, including: ticketing area, break room,
<br />CONCORD, NC 28027
<br />BU2016
<br />-02943
<br />10/18/2016
<br />2625 BETHLEHEM CHURCH RD
<br />Remediation of overcurrent protective devices found to have inadequate short
<br />circuit cur rent ratings.
<br />GOLD HILL, NC 28071
<br />BU2016
<br />-02946
<br />10/18/2016
<br />470 COPPERFIELD BLVD
<br />CONC ORD, NC 28025
<br />BU2016
<br />-02957
<br />10/19/2016
<br />ODELL SCHOOL RD
<br />141
<br />CONCORD, NC 28027
<br />BU2016
<br />-02963
<br />10/19/2016
<br />13722 BILL MCGEE RD
<br />MIDLAND, NC 28107
<br />BU2016 -02964
<br />10/19/2016
<br />5047 NC HWY 24 -27
<br />COMMERCIAL UPFIT
<br />EDWARD JONES CONCORD
<br />CONCORD, NC 28025
<br />MIDLAND, NC 28107
<br />BU2016
<br />-02966
<br />10/19/2016
<br />2420 SUPERCENTER DR
<br />CONCORD, NC 2802
<br />_
<br />modifi cations, electrical modifications and new finishes
<br />KANNAPOLIS, NC 28083
<br />BU2016
<br />-02971
<br />10/20/2016
<br />1045 NORTHEAST GATEWAY C7
<br />upfit existing office / warehouse to create 3 additional office areas
<br />Burgundy Process Installation
<br />Project is the process up -fit for a previously permitted shell (BU2016- 02193).
<br />CONCORD, NC 2 8025
<br />BU2016
<br />_
<br />-02973
<br />10/20/2016
<br />2139 SUPPLY CT
<br />building shell permit submittal , not up -fit. No space classifications are changed
<br />CONCORD, NC 28027
<br />by this project from those in the shell permit.
<br />CONCORD, NC 28027
<br />BU2016 -02974
<br />10/20/2016
<br />3600 S RIDGE AVE
<br />COMMERCIAL UPFIT
<br />EDWARD JONES CONCORD
<br />CONCORD, NC 28025
<br />BU2016 -02977
<br />10/20/2016
<br />301 MEDICAL PARK DR
<br />comme rcial cooking appliances or hood.
<br />Anytime Fitness
<br />CONCORD, NC 2802
<br />_
<br />modifi cations, electrical modifications and new finishes
<br />_ 1 CONCORD,
<br />IBU2016 -02978
<br />10/20/2016
<br />N
<br />commercial upfit
<br />8694 CONCORD MILLS BLVD
<br />upfit existing office / warehouse to create 3 additional office areas
<br />Burgundy Process Installation
<br />Project is the process up -fit for a previously permitted shell (BU2016- 02193).
<br />NC 28027
<br />BU2016 -02979
<br />10/20/2016
<br />8615 CONCORD MILLS BLVD
<br />CONCORD, NC 28027
<br />building shell permit submittal , not up -fit. No space classifications are changed
<br />CONCORD, NC 28027
<br />15CT0083A
<br />tower antenna addition; existing carrier
<br />D S CONTRACTING
<br />COMMERCIAL UPFIT
<br />EDWARD JONES CONCORD
<br />COMMERCIAL UPFIT
<br />C3 Upfit
<br />Upfit grey box into a coffee and ice cream shop. Establishment does not require
<br />BU2016-02985
<br />comme rcial cooking appliances or hood.
<br />Anytime Fitness
<br />Interior non - structural demolition, new partitions, HVAC modifications, plumbing
<br />modifi cations, electrical modifications and new finishes
<br />5CT0467A
<br />tower antenna addition
<br />_
<br />Hanger Clinic
<br />N
<br />commercial upfit
<br />ODELL A UPFIT
<br />upfit existing office / warehouse to create 3 additional office areas
<br />Burgundy Process Installation
<br />Project is the process up -fit for a previously permitted shell (BU2016- 02193).
<br />Includes installation of storage silos, manufacturing process, material conveying
<br />systems and utility infrastructure. Sprinkler system and all partitions are part of
<br />CONCORD, NC 28027
<br />building shell permit submittal , not up -fit. No space classifications are changed
<br />-02987
<br />by this project from those in the shell permit.
<br />CASCO SIGNS - Superior Distribution
<br />One (1) 60" X 120" ground sign
<br />THE SIGN CLINIC
<br />�McDonalds Arch is being moved to the right above the In -Store Unit windows.
<br />CHS Gateway PDR
<br />The remediation of overcurrent protective devices found to have inadequate
<br />BU2016
<br />short ci rcuit cu rrent ratings.
<br />Finnord North America Group
<br />Adding new 480/227V, 3Phase, 4W Electrical Service for new Production
<br />Equipment. Existing Electrical Service is 208/120V. 3 Phase, 4W. Distribution
<br />and branch circuits will be provided as detailed in the provided Electrical
<br />BU2016
<br />Drawings.
<br />Rider Transit Center Upfit
<br />Upfit to existing administrative spaces, including: ticketing area, break room,
<br />women's restroom, offices, conference room. Includes repair /replacement of
<br />sections of existing sanitary waste line /plumbing.
<br />CHS Concord Med Mall Protective Device Remediation
<br />Remediation of overcurrent protective devices found to have inadequate short
<br />circuit cur rent ratings.
<br />Sleep Number
<br />Flooring, paint, cashwrap, 8' shelving fixture install for new Sleep Number store.
<br />Oreck Retail Store
<br />minimal walls being built to create showroom space and back of house storage
<br />BU2016 -02981 110/20/2016 113722 BILL MCGEE RD
<br />MIDLAND. NC 28107
<br />BU2016
<br />-02983
<br />10/20/2016
<br />14700 US HWY 601
<br />MIDLAND, NC 28107
<br />BU2016-02985
<br />10/20/2016
<br />800 SEASONS PL
<br />CONCORD, NC 28027
<br />BU2016
<br />-02986
<br />10/20/2016
<br />900 SEASONS PL
<br />CONCORD, NC 28027
<br />BU2016
<br />-02987
<br />10/20/2016
<br />700 SEASONS PL
<br />CONCORD, NC 28027
<br />BU2016
<br />-02988
<br />10/20/2016
<br />187 BUFFALO AVE
<br />CONCORD, NC 28025
<br />BU2016
<br />-02990
<br />10/20/2016
<br />1215 S RIDGE AVE
<br />I KANNAPOLIS, NC 28083
<br />burgunay vrocess instaiiation
<br />LIGHTHOUSE CORNING PROJECT
<br />SEASONS AT POPLAR TENT BUILDING #8
<br />area. One new office being built. Replace ceiling with new grid, tile and lights.
<br />New electrical and new finishes. Existing ADA restroom to remain.
<br />Project is the process up -fit for a previously permitted shell (BU2016- 02193).
<br />Includes installation of storage silos, manufacturing process, material conveying
<br />systems and utility infrastructure. Sprinkler system and all partitions are part of
<br />building shell permit submittal , not up -fit. No space classifications are changed
<br />by this project from those in the shell permit.
<br />COMPLETION OF INTERIOR WALL BOARDS, CEILING AND FLOORING
<br />INCLUDING INSTALLATION OF DOORS INTO EXISTING FRAMES.
<br />NEW APARTMENTS
<br />12 UNITS
<br />FOOTINGS AND FO UNDATION ONLY
<br />SEASONS AT POPLAR TENT BUILDING #9 NEW APARTMENTS
<br />24 UNITS
<br />FOOTINGS AND FOUNDATION ONLY
<br />SEASONS AT POPLAR TENT BUILDING #7 NEW APARTMENTS
<br />24 UNITS
<br />FOOTINGS AND FOUNDATION ONL
<br />T- Mobile site #5CT0162 187 BUFFALO Collocation on existing tower with equipment cabinet and 200 amp meter
<br />South Ridge Mini Storage Add 2 additional buildings to the parcel
<br />,900
<br />$0
<br />,800,000
<br />$0
<br />$0
<br />1
<br />14,400
<br />Plan ReviewSummary 11111201634421PM 2or3
<br />I -2 Page 284
<br />
|