Laserfiche WebLink
Cabarrus County Commercial Building Plan Review Summary <br />Begin Date: 31112014 through End Date: 313112014 <br />BU2014 -00513 3/7/2014 <br />BU2014 -00517 3/7/2014 <br />BU2014 -00519 3/7/2014 <br />BU2014 -00537 3/11/2014 <br />BU2014 -00539 3/11/2014 <br />BU2014 -00540 3/11/2014 <br />BU2014 -00544 3/11/2014 <br />BU2014 -00554 3/12/2014 <br />BU2014 -00556 3/12/2014 <br />B U 201 4 -00571 3/13/2014 <br />BU2014 -00572 3/13/2014 <br />BU2014 -00573 3/13/2014 <br />BU2014 -00580 3/13/2014 <br />BU2014 -00588 3/14/2014 <br />BU2014 -00589 <br />BU2014 -00592 <br />BU2014 -00598 <br />BU2014 -00607 <br />BU2014 -00609 <br />3/14/2014 <br />3/14/2014 <br />3/17/2014 <br />3/17/2014 <br />3/18/2014 <br />300 PITTS SCHOOL RD <br />CONCORD, NC 28027 <br />3553 US HWY 601 <br />CONCORD, NC 28025 <br />9550 ROCKY RIVER RD <br />HARRISBURG, NC 28075 <br />5405 SAPP RD <br />KANNAPOLIS, NC 28083 <br />1209 BISCAYNE DR <br />CONCORD, NC 28027 <br />1202 S CANNON BLVD <br />KANNAPOLIS, NC 28083 <br />11 UNION ST <br />CONCORD, NC 28025 <br />2011 CRUSADER WAY <br />HUNTERSVILLE, NC 28078 <br />5619 POINDEXTER DR <br />KANNAPOLIS, NC 28081 <br />5001 HAAS WAY <br />CONCORD, NC 28027 <br />4700 POPLAR TENT RD <br />CONCORD, NC 28027 <br />1050 IVEY CLINE RD <br />CONCORD, NC 28027 <br />1497 CONCORD PKWY <br />CONCORD, NC 28025 <br />1445 OAKWOOD AVE <br />KANNAPOLIS, NC 28081 <br />1355 COX MILL RD <br />CONCORD, NC 28027 <br />7940 US HWY 601 <br />CONCORD, NC 28025 <br />10065 EDISON SQUARE DR <br />HUNTERSVILLE, NC 28078 <br />608 DAKOTA ST <br />KANNAPOLIS, NC 28083 <br />1500 CONCORD PKWY <br />CONCORD, NC 28027 <br />PlanReviewSummary 313112014 4:53:27 PM <br />Cabarrus Cc Schools /Pitts School /Pre -cast storage Pre -cast storage buildings for flammable materials. <br />bldg <br />SPRINT BACK UP GENERATOR SPRINT BACKUP GENERATOR <br />HARRISBURG TIME SHARE SUITES <br />American Tower AT &T 074 -963 Sapp Rd. <br />Sprint 2.5 /BYSCAYNE <br />REPLACEMENT <br />COMM UPFIT <br />Co- locate /Equipment and Shelter <br />Building permit will be required. <br />Equipment addition /existing Sprint tower co- location <br />SPRINT 2.5/ CANNON BLVD <br />ATLAS KABOB - DUPLICATE USE BU20 1 4 -00499 <br />SIGN ART <br />SPRINT CR70XCO67 -A UPGRADE <br />STEWART HASS RACING PHASE II & III <br />INTERNATIONAL DRIVE SPEC BLDG <br />WINDSHEAR STORAGE BLDG #A <br />MATTRESS FIRM <br />Cabarrus Co. Schools - Pre -cast storage <br />bldg /Kannapolis Middle <br />Cox Mill High Band Tower <br />Sprint Backup generator replacement <br />EQUIPMENT ADDITION /EXISTING SPRINT TOWER CO -L( <br />THIS PROJECT WAS SUBMITTED TWICE. REFER TO BU, <br />ATLAS KABOB HOUSE <br />COMMERCIAL UPFIT <br />GROUND SIGN <br />CHRIST THE KING CATHOLIC HIGH SCHOOL <br />EQUIPMENT UPGRADE <br />50,000 SF SHELL BULDG APPROVED PREVIOUSLY /STEM <br />RACING TO ACCUPY 50,000 SF. REMAINING 50,000 SF & <br />MEZZANIME TO REMAIN VACANT FOR FUTURE OCCUP, <br />SPEC SHELL TILT -UP CONCRETE BLDG/ <br />8,800 SF MASONRY STORAGE BLDG (2ND BLDG) TO SU <br />WINDSHEAR OPERATION ON THE SAME SITE /RACE AU' <br />WILL HAVE NO FUEL OR OIL /THEY WILL SIMPLE BE PRE <br />WIND TUNNEL TESTING IN THIS BLDG. <br />INTERIOR FINISHES ON A WHITE BOX TENANT SPACE <br />ELECTRICAL SPECIALTY E -STAT SYSTEM <br />Pre -cast storage bldg for flam mable materials <br />COX MILL HIGH SCHOOL BAND TOWER /INSTALL A TOW <br />PARKING LOT FOR BAND DIRECTION DURING PRACTIC <br />generator replacement <br />EDISON SQUARE OFFICE TRAILER (Plans Attached) EDISON SQUARE OFFICE TRAILER <br />ROYAL OAKS ELEMENTARY ROOF REPLACEMENT DEMOLITION OF EXISTING BUIKLT UP ROOFING & REPL <br />WITH NEW INSULATION & SINGLE PLY MEMBRANE/ <br />BOJANGLES BOJANGLES <br />COMMERCIAL NEW BUILDING <br />Attachment number 1 <br />1 -1 <br />