My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2014 06 16
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2014
>
AG 2014 06 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2014 9:32:09 AM
Creation date
11/27/2017 10:47:36 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
6/16/2014
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Outboard roll stop hinge (6 places) * light oil <br />• Outboard roll stop springs (3) * light oil <br />4 Weeks or 100 cycles <br />* Perform all procedures listed in previous section(s) also <br />• Transition plate hinge * light oil <br />• Platform fold axles <br />* light oil <br />• Handrail(s) pivot points (option) light oil <br />1 Year or 1250 Cycles <br />* Perform all procedures listed in previous section(s) also <br />❑ Inspect cotter pins on platform fold axles (2) Replace if needed <br />❑ Inspect gas spring mounting hardware Tighten or replace if needed <br />fl Inspect roll stop for proper operation. Roll <br />Replace defective parts <br />Stop must snap to vertical (UP) position. <br />And /or relubricate. <br />❑ Inspect platform locking channels <br />Resecure or replace <br />Mounting hardware for securement (8 <br />carriage bolts) <br />® Inspect handrail(s) for proper operation <br />Replace defective parts <br />And /or relubrlcate <br />❑ Hydraulic Fluid (Pump) — check level <br />Use Type A transmission <br />Fluid (* See Systems <br />Description for specifications <br />Check fluid level with <br />platform lowered fully. Fill <br />the reservoir to within 'l7" <br />from the top of the reservoir <br />(breather cap hole) <br />❑ Manual Back -up Pump (option) <br />Release valve must be tight. <br />Check for proper operation. <br />Tighten or replace leaky or <br />Faulty hydraulic fittings. <br />Check hydraulic fluid level. <br />( *See Systems Descriptions <br />for Priming and Flushing <br />Procedures). <br />12 <br />Attachment number 2 <br />F -5 Page 219 <br />
The URL can be used to link to this page
Your browser does not support the video tag.