My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2014 06 16
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2014
>
AG 2014 06 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2014 9:32:09 AM
Creation date
11/27/2017 10:47:36 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
6/16/2014
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
drivers are allotted a five minute maximum wait time after arriving at a passenger's home or a desired <br />location before the driver must leave and the passenger is required to call in for their return trip. <br />The maximum one -way ride time for any passenger shall not exceed 30 minutes from the time the <br />passenger boards or enters the vehicle except as may be required due to distance for out -of- county <br />trips. <br />The contractor is encouraged to consolidate unrelated passenger trips into one vehicle. The contractor <br />should attempt to consolidate trips whenever origins, destinations, and scheduled pick -up times are <br />such that reasonable service quality can be maintained. A trip is defined as one or more people with <br />the same origin and destination. If two people have different origins, but the same destinations, it is <br />considered two trips. <br />Performance Monitoring <br />Monitoring is the process CCTS will use to oversee and check the Contractor's performance to be sure <br />that it meets the performance standards. CCTS reserves the right to use any or all of the below <br />monitoring techniques: <br />• Financial audits <br />• Customer surveys <br />• U.S. DOT National Transit Database Reports <br />• Monthly Management Performance Reports <br />• Random Phone Calls <br />• Unannounced visits <br />• Undercover rides <br />• Vehicle /Maintenance Record <br />Over <br />The Contractor will assign a Project Manager who will oversee the operation of the service with regard <br />to performance of work under this Agreement, and ensure that the Contractor performs satisfactorily as <br />accepted by CCTS, <br />16 <br />Attachment number 1 <br />F -4 Page 61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.