My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2013 01 22
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2013
>
AG 2013 01 22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2013 11:53:02 AM
Creation date
11/27/2017 10:54:41 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/22/2013
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
* Subdivision Paving Alternates <br />Priority Length <br />Number SR No. Miles Road Name and Description Est. Cost <br />Note: With this program all un -paved subdivision roads on system will be finished and <br />paved. <br />* In the event that any roads in priority have to be placed on the "Hold List' due to unavailable <br />right of way or environmental review, or if additional funding becomes available, funds will be <br />applied to the roads listed in priority order in the paving alternate list. <br />II. General Secondary Road Improvements <br />Paved Road Improvements <br />I:i.MO O <br />Project Description <br />Est_ Cost <br />SR 1639 <br />Marion Avenue from NC 3 to SR 1639 (Atlanta Ave.). Install 2'- <br />$315,000 <br />6" C &G drainage improvements to allow for 18' pavement width. <br />Total length 0.30 miles <br />SR 1745 <br />Richard Avenue from SR 1643 (Bethpage Road) to Walker <br />$100,000 <br />Avenue. Install 2' -6" C &G to allow for pavement width. Total <br />length 0.10 miles <br />SR 1006 <br />Mt. Pleasant Highway from Oldenburg Drive to Lee Street. <br />$15,000 <br />Install 100' of CMP with 2 drop inlets to allow for shoulder <br />construction. <br />SR 2450 <br />Gold Hill Road East from NC 49 to Stanly County Line. Widen <br />$200,000 <br />2' each side for final width of 20'. Total length 1.60 miles <br />SR 2417 <br />Moose Road from NC 73 to SR 2416 (Mt. Olive Road). Widen 2' <br />$200,000 <br />on each side for final width of 20'. Total length 1.57 miles <br />SR 1113 <br />Hopewell Church Road from SR 1114 (Garmon Mill Rd) to <br />$200,000 <br />Union County Line. Widen 2' on each side for final width of 20'. <br />Total length 2.79 miles <br />SR 1612 <br />Archer Road from SR 1613 (Earnhardt Lake Rd) to SR 1614 <br />$320,000 <br />(Alexander Rd). Widen 1' each side for final width of 20'. Total <br />length 2.26 miles <br />SR 1120 <br />Bethel School Road from 0.5 miles west of US 601. Replace <br />$150,000 <br />18" ppipe with Hyraulic Study recommendation of 2 -48" CMP <br />with headwall. <br />Subtotal <br />"Additional funds over $672,613 from cash balances previously funded. <br />$1,500,000" <br />Attachment number 2 <br />F -1 Page 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.