My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2013 09 16
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2013
>
AG 2013 09 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2013 11:57:06 AM
Creation date
11/27/2017 11:01:51 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/16/2013
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cabarrus County Zoning Ordinance <br />Chapter 8- Conditional Uses <br />The facility is required to implement Level Two buffering about the perimeter. See <br />Chapter 9, Landscaping and Buffer Requirements. <br />The Planning and Zoning Commission shall require a performance guarantee, in a form <br />approved by the County Attorney, to insure that the provisions of the rehabilitation plan are <br />met. The amount of such guarantee shall cover the cost of rehabilitation. The applicant's <br />engineer shall certify to the County the costs of rehabilitation on a per acre basis. If the <br />rehabilitation costs exceed the amounts required by the State, then the difference shall be <br />made up in a bond payable to Cabarrus County, that must be posted before commencement <br />of any earth product extraction operations. <br />13 <br />Landfill, Sanitary or Landfill, Demolition -One Acre or More <br />Agricultural /Open, Limited Industrial and General Indu <br />or adjacent <br />normal <br />f. Existing topography at a contour interval of two feet, based on mean sea level <br />datum. <br />g. Typical cross sections showing extent of overburden, extent of fill and water table <br />elevation, based on mean sea level datum. <br />h. Proposed handling and storage areas for overburden, by- products and fill materials. <br />i. Proposed fencing, screening and gates, parking, service and other areas. <br />j. Any areas proposed for ponding. <br />k. Access roads to the site, as well as on -site roads, with indication of surface <br />treatment to limit dust. Site distances on all roads used for access to the site. <br />3 <br />An Operations Plan sha be submitted including: <br />• The date of commencement of operations and their expected duration <br />• Proposed hours and days of operation <br />• Complete description of operation, including source of materials, method of <br />compaction, type of sealing proposed, types and number of equipment to be <br />used <br />• Any phasing of operations and relationship among phases <br />A Rehabilitation Plan shall be submitted which shall include: <br />• A statement of planned future use of the site, including detailed methods of <br />accomplishment <br />• A map, to the same scale as the site plan, showing final proposed <br />topography, landscaping and ground cover proposed and any drainage or <br />other structures proposed <br />• A phased plan of rehabilitation, related to the operations plan, showing how <br />the rehabilitation will relate to the fill operations and the date of final <br />completion <br />Chapter 8 Page 9 of 33 <br />Revised August, 2013 <br />Attachment number 4 <br />G -1 Page 359 <br />
The URL can be used to link to this page
Your browser does not support the video tag.