Laserfiche WebLink
Alternate No, 2: Provide complete price to furnish and install Lennox HVAC equipment in lieu of other approved <br />manufacturers specified. <br />Alternate No, 2 /V® dAN6C r 5 2� ( 7?D 92 OLLAgy <br />Alternate No. 3: Provide complete price to furnish and install Medeco lock cylinders in lieu of other approved <br />manufacturers as specified in Division 8 Section "Door Hardware ". <br />Alternate No. 3 Al'o Ck�Nrg Z - e 00&CA1ZX <br />Alternate No. 4: Furnish and install First Choice Building Products "3600 Series" exit devices in lieu of other <br />approved exit devices specified in Division 8 Section "Door Hardware ". <br />Alternate No. 4 P�DUGfi ( / 0 (0 �� S'r A' "t/M!7/��� r�21 S <br />Alternate No. 5: Furnish and install Marks USA "Survivor Series" locksets in lieu of other approved locksets <br />specified in Division 8 Section "Door Hardware." <br />Alternate No. .5 APO <br />Alternate No. 6: Furnish and install fiberglass reinforced decorative wall panels and associated trim in toilet rooms <br />101 & 102 as shown and described on the construction drawings. <br />Alternate No. 6 AP O — e l X06, ®° oyi G /iflow Si4 hondkee 4 o11 an - <br />Alternate No. 7: Furnish and install an interior window unit in Fitness Center 103 as shown and described on the <br />construction drawings, <br />Alternate No. 7 i' 2 DD •� 7 n 14�� '�� /►�D Ku/ +"� Gi °`� <br />UNIT PRICES: <br />The following unit prices shall be used for adjustments in the contract price at the Owner's discretion, Items and <br />quantities shown on drawings are to be included in the Base Bid and shall be used as the basis for establishing these <br />unit prices. Refer to DIVISION I — GENERAL REQUIREMENTS, Section 012200 "Unit Prices ". <br />Item <br />UP -1 Unsuitable Soil Excavation and <br />Replacement with Suitable Offsite Fill <br />Price /Unit Quantity in Base Bid <br />_ per bank c.y. zero <br />UP -2 Trench Rock Excavation and Removal <br />from Site, Replacement with <br />Suitable Offsite Fill <br />UP -3 Horn /Strobe Device <br />UP -4 Temporary Fencing <br />a0a O° per bank c.y, zero <br />�lD o�7s• ®® per device indicated on <br />Drawings <br />$� a® per l.f. indicated on <br />drawings <br />The undersigned understands that time is of the essence and agrees to the Contract Time and Liquidated Damages as <br />specified herein, in the AIA Document A 101 Owner /Contractor Agreement as amended by the Owner and in AIA <br />Document A201, General Conditions of the Contract for Construction, 2007 Edition, as amended by the Owner. <br />Accompanying this proposal are the following items: <br />- Required MBE Documentation <br />- Proposed Construction Schedule <br />The undersigned further agrees that this proposal shall be valid for a period of sixty (60) days from the date of <br />receipt of the bids and that if this proposal is accepted by the Owner within this period, the Bidder will execute the <br />GENERAL CONTRACT BID FORM <br />G -2 <br />003000 -2 <br />Attachment number 2 <br />Page 408 <br />