Laserfiche WebLink
Alternate No. 2: Provide complete price to furnish and install Lennox HVAC equipment in lieu of other approved <br />manufacturers specified. <br />Alternate No. 2 No Change <br />Alternate No. 3: Provide complete price to furnish and install Medeco lock cylinders in lieu of other approved <br />manufacturers as specified in Division 8 Section "Door Hardware ". <br />AlternateNo.3 Two Thousand, One Hundred and Eighty Five Dollars and 00/100 - $2,185.00 <br />Alternate No. 4: Furnish and install First Choice Building Products "3600 Series" exit devices in lieu of other <br />approved exit devices specified in Division 8 Section "Door Hardware ". <br />Alternate No. 4 No Change <br />Alternate No. 5: Furnish and install Marks USA "Survivor Series" locksets in lieu of other approved locksets <br />specified in Division 8 Section "Door Hardware." <br />Alternate No. 5 Four Thousand, Four Hundred and Eighty Five Dollars and 00/100 - $4,485.00 <br />Alternate No. 6: Furnish and install fiberglass reinforced decorative wall panels and associated trim in toilet rooms <br />101 & 102 as shown and described on the construction drawings. <br />Alternate No. 6 One Thousand, Five Hundred and Fifty Four Dollars and 00/100 - $1,554.00 <br />Alternate No. 7: Furnish and install an interior window unit in Fitness Center 103 as shown and described on the <br />construction drawings. <br />Alternate No. 7 Three Hundred, Thirty One Dollars and 00/100 - $331.00 <br />UNIT PRICES: <br />The following unit prices shall be used for adjustments in the contract price at the Owner's discretion. Items and <br />quantities shown on drawings are to be included in the Base Bid and shall be used as the basis for establishing these <br />unit prices. Refer to DIVISION 1 — GENERAL REQUIREMENTS, Section 012200 "Unit Prices ". <br />Item <br />UP -1 Unsuitable Soil Excavation and <br />Replacement with Suitable Offsite Fill <br />UP -2 Trench Rock Excavation and Removal <br />from Site, Replacement with <br />Suitable Offsite Fill <br />Price/Unit I Quantity in Base Bid <br />37.50 per bank c.y. zero <br />175.00 per bank c.y. zero <br />UP -3 Horn/Strobe Device <br />UP -4 Temporary Fencing <br />The undersigned understands that time is of the essence and agrees to the Contract Time and Liquidated Damages as <br />specified herein, in the AIA Document Al 01 Owner /Contractor Agreement as amended by the Owner and in AIA <br />Document A201, General Conditions of the Contract for Construction, 2007 Edition, as amended by the Owner. <br />Accompanying this proposal are the following items: <br />- Required MBE Documentation <br />- Proposed Construction Schedule <br />287.50 per device indicated on <br />Drawings <br />4.20 per Lf. indicated on <br />drawings <br />The undersigned further agrees that this proposal shall be valid for a period of sixty (60) days from the date of <br />receipt of the bids and that if this proposal is accepted by the Owner within this period, the Bidder will execute the <br />GENERAL CONTRACT BID FORM <br />G -2 <br />PdW6U@-nJ number 4 <br />Page 422 <br />