My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2013 09 16
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2013
>
AG 2013 09 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2013 11:57:06 AM
Creation date
11/27/2017 11:01:51 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/16/2013
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alternate No. 2: Provide complete price to furnish and install Lennox HVAC equipment in lieu of other approved <br />manufacturers specified. <br />Alternate No. 2 <br />Alternate No. 3: Provide complete price to furnish and install Medeco lock cylinders in lieu of other approved <br />manufacturers as specified in Division 8 Section "Door Hardware ". <br />Alternate No. 3 .0 <br />Alternate No. 4: Furnish and install First Choice Building Products "3600 Series" exit devices in lieu of other <br />approved exit devices specified in Division 8 Section "Door Hardware ". <br />Alternate No. 4 1�y <br />Alternate No. 5: Furnish and install Marks USA "Survivor Series" locksets in lieu of other approved locksets <br />specified in Division 8 Section "Door Hardware." <br />Alternate No. 5 1 i I ILQ .00 <br />Alternate No. 6: Furnish and install fiberglass reinforced decorative wall panels and associated trim in toilet rooms <br />101 & 102 as shown and described on the construction drawings. <br />Alternate No. 6 1 ! 15 O • �® <br />Alternate No. 7: Furnish and install an interior window unit in Fitness Center 103 as shown and described on the <br />construction drawings. <br />Alternate No. 7 <br />y4 5 .00 <br />UNIT PRICES: <br />The following unit prices shall be used for adjustments in the contract price at the Owner's discretion. Items and <br />quantities shown on drawings are to be included in the Base Bid and shall be used as the basis for establishing these <br />unit prices. Refer to DIVISION 1 — GENERAL REQUIREMENTS, Section 012200 "Unit Prices ". <br />Item <br />UP -1 Unsuitable Soil Excavation and <br />Replacement with Suitable Offsite Fill <br />UP -2 Trench Rock Excavation and Removal <br />from Site, Replacement with <br />Suitable Offsite Fill <br />UP -3 Horn/Strobe Device <br />UP -4 Temporary Fencing <br />Price/Unit I Quantity in Base Bid <br />25' <br />10w' per bank c.y. zero <br />31 ' 0 p er bank c.y. zero <br />3 12' 5' per device indicated on <br />Drawings <br />' <br />1 1 9 15 ' per l.f. indicated on <br />drawings <br />The undersigned understands that time is of the essence and agrees to the Contract Time and Liquidated Damages as <br />specified herein, in the AIA Document A10 I Owner/Contractor Agreement as amended by the Owner and in AIA <br />Document A201, General Conditions of the Contract for Construction, 2007 Edition, as amended by the Owner. <br />Accompanying this proposal are the following items: <br />- Required MBE Documentation <br />- Proposed Construction Schedule <br />The undersigned further agrees that this proposal shall be valid for a period of sixty (60) days from the date of <br />receipt of the bids and that if this proposal is accepted by the Owner within this period, the Bidder will execute the <br />GENERAL CONTRACT BID FORM <br />G -2 <br />A66SW68n� number 5 <br />Page 430 <br />
The URL can be used to link to this page
Your browser does not support the video tag.