Laserfiche WebLink
Asbestos Survey Report Irerracon <br />Old Bethel Elementary School up. Midland„ North Carolina <br />November 29, 2010 ,i Terracon Project No. 71107253 <br />Building B and Building C were constructed as one building, but functionally treated as separate <br />buildings. Building B/C is located at the northeast corner of the property. The building was <br />originally constructed in 1957. Building B is the gymnasium and Building C is a classroom <br />building. Building B is approximately 9400 square feet and single story. The gymnasium is <br />comprised of the gymnasium, a boys locker room„ a girls locker room and a lobby. The walls <br />are painted block. The ceilings are open to the roof deck in the gymnasium and piaster in the <br />lobby and locker rooms. The floors are wood in the gymnasium, ceramic tile in the locker rooms <br />and floor tile in the lobby. The roof is a flat membrane roof. The heating system is a steam <br />radiator system. There is no cooling system for the building. <br />Building C is approximately 9000 square feet and single story. The walls are plaster and wood <br />panel. The floors are concrete with coverings of floor tile and carpet. The ceilings are plaster <br />with spray - applied ceiling texture. The roof is a flat membrane roof. The heating system is a <br />steam radiator system. The cooling system consists of individual units below the windows <br />connected to roof - mounted condensing units. <br />Building D is located behind Building A and abuts Building E. Building D was the kitchen and <br />cafeteria building. The building is approximately 5100 square feet and single story. The walls <br />are painted block and wood panels. The floors are concrete with coverings of floor tile and <br />ceramic tile. The ceilings are suspended ceiling tile in the cafeteria and {Master in the kitchen. <br />The roof is a flat membrane roof. The heating system is a steam radiator system. The cooling <br />system consists of individual units in the ceiling connected to roof- mounted condensing units. <br />Building E is located at the back of the property and abuts Building D. Building E was the <br />agricultural, vocational and shop building. The building is approximately 8900 square feet and <br />single story. The walls are painted block and plaster. The floors are concrete with coverings of <br />floor tile and ceramic tile. The ceilings are suspended ceiling tile. The roof is a flat membrane <br />roof. The heating system is a steam radiator system, but the original boiler has been removed. <br />The cooling system consists of individual, ducted air units. <br />Several outbuildings associated with three baseball fields are also located on the property. The <br />outbuildings include a concessions stand with restrooms, eight dugout and spectator structures <br />and three press boxes. The concessions stand is block and concrete construction with a sloped <br />asphalt shingle roof. The dugout and spectator structures are open wood construction with <br />sloped asphalt shingle roofs. The press boxes are wood construction with vinyl siding and <br />sloped asphalt shingle roofs.. <br />Reliable ■ Responsive ■ Convenient ■ Innovative <br />2 <br />Attachment number 4 <br />G -6 Page 282 <br />