My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2012 01 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2012
>
AG 2012 01 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2012 2:44:56 PM
Creation date
11/27/2017 11:06:16 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/17/2012
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Asbestos Survey Report 1rerracon <br />Old Bethel Elementary School Midland, North Carolina <br />November 29, 2010 Ea Terracon Project No. 71 107253 <br />specifies work practices and precautions which employers must follow when engaging in each <br />class of regulated work. States which administer their own federally- approved state OSHA <br />programs may require additional precautions. <br />5.0 FINDINGS AND RECOMMENDATIONS <br />Laboratory analysis confirmed the presence of friable and/or non - friable asbestos - containing <br />materials. A summary of the classification, condition and approximate quantity of confirmed AGM <br />are presented in Appendix B. Laboratory analytical reports are included in Appendix C. <br />Based on the quantity of the materials, State of North Carolina regulations will require an asbestos <br />abatement specification and clearance air monitoring for the abatement project. Terracon could <br />provide Client with a proposal for developing asbestos abatement specifications and for <br />performing abatement oversight and air monitoring upon request.. <br />6.0 GENERAL COMMENTS <br />This asbestos survey was conducted in a manner consistent with the level of care and skill <br />ordinarily exercised by members of the profession currently practicing under similar conditions in <br />the same locale. The results, findings, conclusions and recommendations expressed in this report <br />are based on conditions observed during our survey of the structures. The information contained <br />in this report is relevant to the dates on which this survey was performed, and should not be relied <br />upon to represent conditions at a later date. This report has been prepared on behalf of and <br />exclusively for use by Cabarrus County General Services for specific application to their project <br />as discussed. This report is not a bidding document. Contractors or consultants reviewing this <br />report must draw their own conclusions regarding further investigation or remediation deemed <br />necessary. Terracon does not warrant the work of regulatory agencies, laboratories or other third <br />parties supplying information which may have been used in the preparation of this report. No <br />warranty, express or implied is made. <br />Reliable ■ Responsive ■ Convenient t Innovative <br />5 <br />Attachment number 4 <br />G -6 Page 285 <br />
The URL can be used to link to this page
Your browser does not support the video tag.