Laserfiche WebLink
D <br />c <br />3 <br />m <br />c <br />3 <br />s <br />m <br />i ierrac <br />Inspector: William Reid <br />License: 11977 <br />Date: 11/2 9/2010 <br />Asbestos survey Form <br />Job Name: Old B ethel ES <br />Job Number <br />Area <br />711 07253 <br />A Building <br />Sample <br />Friable! <br />No, <br />Homogeneous Material Description <br />Sample Location <br />Floor <br />Condition <br />Quantity <br />Non - Friable <br />10 -1 <br />9 "x9" Dotted Floor tile and Mastic <br />Ms. Kreuker Room 11 <br />D <br />500 ft <br />Non- Friable <br />10 -2 <br />9 "x9" Clotted Floor tile and Mastic <br />Ms. Kreuker Room 11 <br />10 -3 <br />9 "x9" Dotted Floor the and Mastic <br />Ms. Kreuker Room 11 <br />11 -1 <br />12 "x12" Beige Floor tile and Mastic <br />Attached to Room 11 <br />D <br />500 ft <br />Non- Friable <br />11 -2 <br />12 "x12" Beige Floor tile and Mastic <br />Attached to Room 11 <br />11 -3 <br />12 "x12'' Beige Floor tle and Mastic <br />Attached to Room 11 <br />12 -1 <br />Roof Membrane <br />Roof <br />R <br />D <br />10,Qd0 ft <br />Non - Friable <br />12 -2 <br />Roof Membrane <br />Roof <br />R <br />12 -3 <br />Roof Membrane <br />Roof <br />R <br />13 -1 <br />Roof Flashing <br />Roof <br />R <br />D <br />S00 ft` <br />Non - Friable <br />13 -2 <br />Roof Flashing <br />Roof <br />R <br />13 -3 <br />Roof Flashing <br />Roof <br />R <br />14 -1 <br />Roof Membrane <br />Center Upper Roof <br />R <br />D <br />5,400 ft' <br />Non - Friable <br />14 -2 <br />Roof Membrane <br />Center Upper Roof <br />R <br />14 -3 <br />Roof Membrane <br />Center Upper Roof <br />R <br />15 -1 <br />Black Mastic <br />Roof Penetrations <br />R <br />D <br />100 ft' <br />Non- Friable <br />15 -2 <br />Black Mastic <br />Roof Penetrations <br />R <br />15 -3 <br />Black Mastic <br />Roof Penetrations <br />R <br />16 -1 <br />Particle Board <br />Above Suspended Ceiling Tile <br />2 <br />SD <br />27,000 ft� <br />Friable <br />16 -2 <br />Particle Board <br />Above Suspended Ceiling Tile <br />2 <br />16 -3 <br />Particle Board <br />Above Suspended Ceiling Tile <br />2 <br />17 -1 <br />Wallboard and Joint Compound <br />Second Floor Corridor <br />2 <br />D <br />30,000 ft2 <br />Friable <br />17 -2 <br />Wallboard and Joint Compound <br />Second Floor Corridor <br />2 <br />17 -3 <br />Wallboard and Joint Compound <br />Third Floor Corridor <br />3 <br />18 -1 <br />Thermal System Insulation (TSI) <br />Crawlspaces <br />C <br />D <br />1,000 ft <br />Friable <br />18 -2 <br />Thermal System Insulation (TSI) <br />Crawlspaces <br />C <br />18 -3 <br />Thermal System Insulation TSI} <br />Crawlspaces <br />C <br />18 -4 <br />IThermal System Insulation (TSI) <br />Crawlspaces <br />C <br />18 -5 IThermal <br />System Insulation (TSI) <br />Crawlspaces <br />C <br />G v Good <br />D = Damaged <br />SD = Significantly Damaged <br />G -6 <br />PWgp_V& of 2 <br />