My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2012 01 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2012
>
AG 2012 01 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2012 2:44:56 PM
Creation date
11/27/2017 11:06:16 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/17/2012
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D <br />0 <br />3 <br />a <br />0- <br />AS <br />11121 Irdr.,.0n <br />Inspector: William Reid <br />License: 11977 <br />Date: 12!212010 <br />Asbestos Survey Form <br />Jab Name: Old Bethel ES <br />Job Number: 71107253 <br />Area: B Buildinca <br />Sample <br />No. <br />Homogeneous Material Description <br />Sample Location <br />Floor <br />Condition <br />Quantity <br />Friable/ <br />Non - Friable <br />1 -1 <br />9"X9" White Floor the and Mastic <br />Lobby <br />1 <br />D <br />550 ft <br />Non - Friable <br />1 -2 <br />9 "x9" White Floor tile and Mastic <br />Lobby1 <br />1 -3 <br />9 "x9" White Floor tile and Mastic <br />Lobby1 <br />2 -1 <br />Ceiling Texture <br />Lobby <br />1 <br />❑ <br />750 ft <br />Friable <br />2 -2 <br />Ceiling Texture <br />Lobby1 <br />2 -3 <br />Ceiling Texture <br />Lobby1 <br />3 -1 <br />Black Cove Base and Mastic <br />Throu hout <br />1 <br />D <br />10o ft <br />Nan - Friable <br />3 -2 <br />Black Cove Base and Mastic <br />Throughout <br />1 <br />3 -3 <br />Black Cove Base and Mastic <br />Throughout <br />1 <br />4 -1 <br />TSI Straight Run <br />Boys and Girls Locker Room <br />1 <br />SD <br />200 ft <br />Friable <br />4 -2 <br />TSI Straight Run <br />Bo $ and Girls Locker Room <br />1 <br />4 -3 <br />TSI Straight Run <br />Boys and Girls Locker Room <br />1 <br />4 -4 <br />TSI Elbows <br />Boys and Girls Locker Room <br />1 <br />SD <br />13 Elbows <br />Friable <br />4 -5 <br />TSI Elbows <br />Boys and Girls Locker Room <br />1 <br />4 -6 <br />Tank Insulation <br />Boys Locker Room <br />1 <br />D <br />300 ft <br />Friable <br />4 -7 <br />Tank Insulation <br />Boys Locker Room <br />1 <br />4 -8 <br />Tank Insulation <br />Boys Locker Room <br />1 <br />5 -1 <br />9 "x9" Dotted Floor tile and Mastic <br />Boys and Girls Locker Room <br />1 <br />SD <br />50 <br />Non - Friable <br />5 -2 <br />9 "x9" Dotted Floor tile and Mastic <br />Boys and Girls Locker Room <br />1 <br />5 -3 <br />9 "x9" Dotted Floor the and Mastic <br />Boys and Girls Locker Room <br />1 <br />6 -1 <br />Tank Insulation <br />Bo s Locker Room <br />1 <br />D <br />200 ft <br />Friable <br />6 -2 <br />Tank Insulation <br />Boys Locker Room <br />1 <br />6 -3 <br />Tank Insulation <br />Boys Locker Room <br />1 <br />7 -1 <br />Window Glazing <br />Lobby Windows <br />ext <br />SD <br />60 Windows <br />Non - Friable <br />7 -2 <br />Window Glazing <br />Lobby Windows <br />ext <br />7 -3 <br />Window Glazing <br />Lobby Windows <br />ext <br />8 -1 <br />Roof Membrane <br />Roof <br />ext <br />D <br />9,400 ft <br />Non- Friable <br />8 -2 <br />Roof Membrane <br />Roof <br />ext <br />8 -3 <br />Roof Membrane <br />Roof <br />ext <br />G = Good <br />D = Damaged <br />SD = Significantly Damaged <br />G -6 <br />P;Rg'l -q2 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.