My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2012 01 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2012
>
AG 2012 01 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2012 2:44:56 PM
Creation date
11/27/2017 11:06:16 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/17/2012
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lead Survey Report Irerracon <br />Old Bethel Elementary School w Midland, North Carolina <br />November 29, 2010 n Terracon Project No. 71107253 <br />are painted block. The ceilings are open to the roof deck in the gymnasium and plaster in the <br />lobby and locker rooms. The floors are wood in the gymnasium, ceramic the in the locker rooms <br />and floor tile in the lobby. The roof is a flat membrane roof. The heating system is a steam <br />radiator system. There is no cooling system for the building. <br />Building C is approximately 9000 square feet and single story. The walls are plaster and wood <br />panel. The floors are concrete with coverings of floor the and carpet. The ceilings are plaster <br />with spray - applied ceiling texture. The roof is a flat membrane roof. The heating system is a <br />steam radiator system. The cooling system consists of individual units below the windows <br />connected to roof - mounted condensing units. <br />Building D is located behind Building A and abuts Building E. Building D was the kitchen and <br />cafeteria building. The building is approximately 6100 square feet and single story. The walls <br />are painted block and wood panels. The floors are concrete with coverings of floor tile and <br />ceramic tile. The ceilings are suspended ceiling tile in the cafeteria and plaster in the kitchen. <br />The roof is a flat membrane roof. The heating system is a steam radiator system. The cooling <br />system consists of individual units in the ceiling connected to roof - mounted condensing units. <br />Building E is located at the back of the property and abuts Building D. Building E was the <br />agricultural, vocational and shop building. The building is approximately 8900 square feet and <br />single story. The walls are painted block and plaster. The floors are concrete with coverings of <br />floor tile and ceramic tile. The ceilings are suspended ceiling tile. The roof is a flat membrane <br />roof. The heating system is a steam radiator system, but the original boiler has been removed. <br />The cooling system consists of individual, ducted air units. <br />Several outbuildings associated with three baseball fields are also located on the property. The <br />outbuildings include a concessions stand with restrooms, eight dugout and spectator structures <br />and three press boxes. The concessions stand is block and concrete construction with a sloped <br />asphalt shingle roof. The dugout and spectator structures are open wood construction with <br />sloped asphalt shingle roofs. The press boxes are wood construction with vinyl siding and <br />sloped asphalt shingle roofs. <br />3.0 FIELD ACTIVITIES <br />The survey was conducted by Terracon's inspectors Mr. Russell Harrings, Mr. William Reid and <br />Mr. Christopher Kelley. Suspect LP samples were collected from representative locations of <br />suspect LP. A summary of survey activities is provided below. <br />Reliable ■ Responsive ■ Convenient ■ Innovative <br />2 <br />Attachment number 9 <br />G -6 Page 375 <br />
The URL can be used to link to this page
Your browser does not support the video tag.