Laserfiche WebLink
5. The project will provide a trail or greenway (1/4 mile or longer) <br />that links to existing recreation area(s), school(s), downtown businesses, <br />and /or communities located outside of the park. (5 points) <br />❑ Yes ® No <br />Site plan must show trail linkage. List the existing areas by name to be linked by the <br />proposed trail: <br />N/A <br />18 <br />Attachment number 1 <br />F -3 Page 118 <br />