Laserfiche WebLink
protrude beyond the face of the bumper or bumper guards. The system as installed shall meet the <br />minimum requirements of Federal Specification Does your Y bid comply? Yes No <br />7.0 ADDITIONAL SYSTEMS, EQUIPMENT, ACCESSORIES & SUPPLIES <br />7.1 S tandard Mandatory Miscellaneous E <br />Unless otherwise precluded elsewhere in this specification, the ambulance shall be equipped with <br />but not limited to the following: <br />A. No Smoking Signs <br />Two (2) "No Smoking Oxygen Equipped" signs. Does your bid comply? Yes No <br />B. Fasten Seat Belt Suns <br />Two (2) "Use Of Seat Belt Required" signs. <br />Does your bid comply? Yes No <br />C. Overhead Grab Rail <br />Minimum 72 "L x 1.25 "D, maximum 4 inch4 -inch depth, on the ceiling over the primary patient, <br />contour rolled at each end with no protruding sharp edges. The grab rail shall be installed and <br />perform in accordance with AMD Standard 008 Does your bid comply? Yes No <br />7.2 Paint OPTIONAL — SEE OPTIONAL PRICING SECTION OF THIS BID <br />The ambulance shall be painted in accordance with KKK- A -1822E specifications for Preparation <br />and Painting. Only a polyurethane paint system shall be used to paint the modular . body. Both <br />white and colored units will be painted with a base coat/clear coat system. Prior to painting, the <br />entire module shall be carefully ground to remove all welding slag and major scratches in body <br />surface. The module is then washed with a wax and grease remover to remove all oil, dirt and <br />grease left over from the manufacturing process. The entire module is then sanded using a dual <br />action sander (DA). Areas that cannot be sanded with a DA shall be hand sanded and scuffed <br />using grit sand paper and scotch bright pads. All deep scratches, dents and low spots along with <br />roof corners and roof seams will be body <br />blown off and wash-primed. 11 When i the body has <br />putty and then sanded. The body will then <br />dried, it shall be tacked and sprayed with three wet coats of a combination of primer to total dry <br />film build of 4.0 — 6.0 mills and bake• Pinholes will <br />wax and greadse the entire unit <br />remover and <br />sanded with 220 grit. The unit will t hen be <br />seam sealed with 3M 8360 seam sealer. The unit will be blown off, washed with wax and grease <br />remover and tacked off. All bare metal areas will be touched up with a wash primer. Once dried <br />the unit will again be tacked off. <br />The unit will then receive a wet coat application of an epoxy primer /sealer, cured and coated <br />with a PPG Delfleet paint process. Delfleet is a high solids Polyurethane Basecoat that is a fast <br />drying low VOC basecoat /clear coat polyurethane designed to produce ultimate durability with a <br />highly polished finish. The unit will then be baked to cure and then sanded with 1000 grit to <br />remove imperfections, dusted off and buffed with 3M Prefect -it II System. <br />All materials in the painting process must be rated as containing low V.O.C.'S making the <br />process as environmentally friendly as possible. <br />33 <br />Attachment number 1 <br />F -5 Page 130 <br />