Laserfiche WebLink
Exhibit H <br />Document List <br />Cabarrus County 6th and 7th Floor <br />29- Feb -12 <br />Sheet Number <br />Description <br />Date Issued <br />Date_ Revised <br />Revisions <br />ARCHITECTURAL <br />A -1 <br />COVER SHEET AND APPENDIX B <br />1/17/2012 <br />2/20/2012 <br />Addendum 2 <br />A -1.1 <br />CHAPTER 34 SUMMARY AND CALCULATION SHEETS <br />1/17/2012 <br />A -1.2 <br />UL DESIGN <br />1/17/2012 <br />A -2 <br />PARTIAL 3RD, 4TH, 5TH AND 6TH FLOOR PLAN <br />1/17/2012 <br />A -3 <br />LIFE SAFETY PLANS- THIRD, FORTH AND ROOF (REV2 <br />1/17/2012 <br />A -4 <br />DEMOLITION PLAN <br />1/17/2012 <br />A -5 <br />7TH FLOOR PLAN <br />1/17/2012 <br />2/20/2012 <br />Addendum 2 <br />A -6 <br />7TH FLOOR PLAN <br />1/17/2012 <br />1/31/2012 <br />Addendum 1 <br />A -7 <br />DIMENSIONING PLAN <br />1/17/2012 <br />A -8 <br />DIMENSIONING PLAN <br />1/17/2012 <br />A -9 <br />ROOM FINISH SCHEDULE <br />1/17/2012 <br />2/20/2012 <br />Addendum 2 <br />A -10 <br />DOOR AND WINDOW SCHEDULE <br />1/17/2012 <br />2/20/2012 <br />Addendum 2 <br />A -11 <br />WALLTYPES <br />1/17/2012 <br />A -11.1 <br />WALL TYPES <br />1/17/2012 <br />A -12 <br />COLUMN AND PILASTER DETAILS <br />1/17/2012 <br />A -13 <br />COLUMN AND PILASTER DETAILS <br />1/17/2012 <br />A -14 <br />MISCELLANEOUS DETAILS <br />1/17/2012 <br />A -15 <br />CASEWORK ELEVATIONS AND DETAILS <br />1/17/2012 <br />A -16 <br />INTERIOR WALL ELEVATIONS <br />1/17/2012 <br />A -17 <br />INTERIOR WALL ELEVATIONS <br />1/17/2012 <br />A -18 <br />REFLECTED CEILING PLAN <br />1/17/2012 <br />AB -1 <br />PARTIAL PLAN <br />1/31/2012 <br />Addendum 1 <br />AB -1.1 <br />DETAILS <br />1/31/2012 <br />Addendum 1 <br />AB -2 <br />DETAILS OF COAT HOOKS <br />1/31/2012 <br />Addendum 1 <br />AB -3 <br />WINDOW DETAILS _ <br />1/31/2012 <br />Addendum 1 <br />AB -3.1 <br />WINDOW DETAILS <br />1/31/2012 <br />Addendum 1 <br />AB -4 <br />PARTIAL EXISTING ROOF FRAMING PLAN <br />1/31/2012 <br />Addendum 1 <br />AB -4.1 <br />CROSS BRACING DETAILS <br />1/31/2012 <br />Addendum 1 <br />AB -5 <br />WALL ELEVATION @ FATS 721, DETAILS <br />1/31/2012 <br />Addendum 1 <br />AB -5.1 <br />WALL ELEVATION @ DOCC 700 <br />1/31/2012 <br />Addendum 1 <br />AB -6 <br />PARTIAL PLAN, DETAIL <br />1/31/2012 <br />Addendum 1 <br />AB -6.1 <br />WALL SECTION <br />1/31/2012 <br />Addendum 1 <br />AB -7 <br />PARTIAL PLAN <br />2/20/2012 <br />Addendum 2 <br />AB -8 <br />PARTIAL PLAN CEILING PLAN @ DOCC 700 & IN- SERVICE 701 <br />2/20/2012 <br />Addendum 2 <br />AB -8.1 <br />DETAIL <br />2/20/2012 <br />Addendum 2 <br />AB -9 <br />PARTIAL CEILING PLAN @ FATS 721 <br />2/20/2012 <br />Addendum 2 <br />AB -9.1 <br />DETAIL _ _ <br />2/20/2012 <br />Addendum 2 <br />AB -10 <br />DETAIL <br />2/20/2012 <br />Addendum 2 <br />AB -11 <br />PARTIAL CEILING PLAN @ SCAT 709 <br />2/20/2012 <br />Addendum 2 <br />AB -11.1 <br />DETAIL <br />2/20/2012 <br />Addendum 2 <br />MECHANICAL <br />M -1 <br />DEMOLITION MECHANICAL FLOOR PLAN <br />1/17/2012 <br />M -2 <br />MECHANICAL RENOVATION FLOOR PLAN <br />1/17/2012 <br />M -3 <br />MECHANICAL RENOVATION FLOOR PLAN <br />1/17/2012 <br />M -4 <br />MECHANICAL RENOVATION FLOOR PLAN - PIPING AND BALANCING <br />1/17/2012 <br />M -5 <br />MECHANICAL RENOVATION FLOOR PLAN - PIPING AND BALANCING <br />1/17/2012 <br />M_ -6 <br />SCHEDULE <br />1/17/2012 <br />M -7 <br />DETAILS <br />1/17/2012 <br />M -8 <br />DETAILS <br />1/17/2012 <br />M -9 <br />SEQUENCE OF OPERATION <br />1/17/2012 <br />M -10 <br />SEISMIC DETAILS <br />1/17/2012 <br />MBD -1 <br />PARTIAL FLOOR PLAN <br />1/31/2012 <br />Addendum 1 <br />MBD -2 <br />PARTIAL FLOOR PLAN <br />1/31/2012 <br />Addendum 1 <br />MBD -3 <br />PARTIAL FLOOR PLAN <br />1/31/2012 <br />Addendum 1 <br />MBD -4 <br />PARTIAL FLOOR PLAN <br />1/31/2012 <br />Addendum 1 <br />Page 15 of 24 <br />M WR4 Athm�Zp <br />F -3 Page 55 <br />