Laserfiche WebLink
Cabarrus County Zoning Ordinance <br />Chapter 7- Performance Based Standards <br />Office /Limited Commercial, General Commercial, Limited Industrial, General Industrial <br />districts <br />a) PeFn9+t. A twelve month permit, which is renewable, must be obtained from the Zoning <br />Administrator. The demolition landfill is presumed to be an adjunet accessor to an ongoing <br />construction pFeeess project and as such, is permitted only for the life of the construction <br />project. <br />The permit requires the submission of the following information at the time it is applied for: <br />a. A survey showing the exact location of the proposed demolition landfill within the <br />entire project must be submitted. <br />b. Gent nts ef'anaF, ". A statement detailing all contents of the landfill 0 5 a+ee <br />c Ree o f la a A statement detailing the plans for reclaiming the <br />landfill at the end of its use n. ust be <br />d. FHtHFe bHild.ngs plans. A statement i=ni st a-1 he sHbn9 describing plans for <br />future building, if any, on the landfill site. <br />e. FkegisteF ef 9eeds. A boundary survey she the location of the demolition landfill <br />must be FegisteFed recorded with the Cabarrus County Register of Deeds. <br />f. AppeaFanee ef landfill. A description of rhe controls to be employed to assure the <br />refuse stays on the site feF exangple, dees net blew eHt with winds and that dust, <br />debris, material scraps, etc. do not travel to or impact adjacent properties or right - <br />of -ways in any way. <br />29. Maehmne welding 94&p <br />te <br />leeate the <br />C T A N9 n ff f1 C. <br />Siting. in be <br />a) ne event will a n9aehine welding shep <br />paFeel/tFaet as Fetail business. <br />pemqitted <br />en sange <br />building <br />i <br />21 Meb.i'e henge e'asr. T <br />density Fesidential/n9imed use. <br />Chapter 7 Page 18 of 39 <br />Attachment number 4 <br />G -1 Page 213 <br />