My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2012 07 16
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2012
>
AG 2012 07 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2012 3:37:25 PM
Creation date
11/27/2017 11:10:02 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
7/16/2012
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cabarrus County Zoning Ordinance <br />Chapter 7- Performance Based Standards <br />64. Warehouse with 6t3e� Outside Storage <br />Limited Industrial and General Industrial <br />a. Outside stacking of materials should not be visible to the passing motorist traveling <br />any adjacent external road. <br />b. Materials must be "wed screenec, with Level Three buffering. FeF bHffeF le ve l s, <br />Chapter 9, Landscaping and Buffering Requirements. FeF bHffeF le ve l s, seee <br />Five. <br />65. Wind Energy Facility, Accessory Use, On Site Use Only <br />Agriculture /Open, Countryside Residential, Low Density Residential and Medium Density <br />Residential districts <br />a. The site must be a minimum of 5 acres. <br />b. Turbines must be located 2 times the height of the tower structure from any <br />property line or structure, including structures on adjacent properties. <br />c. The height of the structure may not exceed 65 feet. <br />d. Energy produced must be used on the same parcel. <br />e. A decommissioning plan shall be provided that describes the anticipated life of the <br />Facility, estimated decommissioning costs and responsible party for decommissioning <br />the Facility. <br />f. A maintenance plan shall be provided describing the maintenance schedule for the <br />structure including the name, address and phone number of responsible party for <br />maintenance. <br />66 Wireless Telecommunications Services, Co- location <br />. - ,t j f iculture /Opt_,, �,�u , �_ountrysiue Residerl,ia., mow Density Residential, Medium Density <br />Residential districts, High Density Residential /Mixed Use, Office /Institutional, Office /Limited <br />Commercial, General Commercial, Light Industrial and General Industrial districts <br />a. See Chapter 8, Section 8 -4, 38 <br />TABLE TW9! USES O. 1N \A/LJIGH THE* ARE P � I:F:FE 1 B* CTAI� 9Af' 9S <br />TT �. Z.T 1T0 O '0'TTlt I"ITITCTTT�rCRT'rl1TTTr <br />67. Temporary Uses <br />The Temporary Use Permit is a mechanism to allow a use on a short -term basis and certain <br />seasonal or transient uses not otherwise allowed. Prior to conducting or establishing a <br />temporary use or structure, approval of a Temporary Use Permit is required pursuant to <br />Chapter 12 of this Zoning Ordinance. <br />Chapter 7 Page 33 of 39 <br />Attachment number 4 <br />G -1 Page 228 <br />
The URL can be used to link to this page
Your browser does not support the video tag.