Laserfiche WebLink
RCCC - one time project funding request <br />Expansion and renovation of Building 3000 $ 380,000 Funded in June 2012 <br />The County funded the addition of 3,000 new square and the renovation of 4,000 existing square feet at <br />Building 3000 on South Campus. This space will provide for multi - purpose, student commons, food service, <br />and classroom space. <br />1 Building 4000 <br />$ 10,800,000 <br />Build a 60,000 square foot building with three levels for classrooms, computer rooms, vocational labs, <br />workshops, instructional and administrative offices, and the Central Engineering Plant for the Campus. <br />estimated construction cost of $180 per square for (FY2013 values) <br />2 Land and Roadway into Stanly Works $ 1,700,000 <br />RCCC believes a western access tying into the Stanley Works entrance road off of HWY 73 would be a <br />very efficient route and would improve access to several properties in the area. This route would be approximately <br />3000 linear feet and require a 50 foot right of way. Purchase of 3.5 acres for a total cost of $350,000 and estimating to <br />construct the 3000 linear feet of standard width two -lane roadway at $450 /LF would be $1,350,000 (FY 2013 values) <br />3 Energy Conservation Measures $ 153,000 New <br />Duke Energy was contracted with this past spring to perform an energy audit of the south campus of RCCC. <br />The energy saving identified are believed to achieve a 4 year payback from savings to cover the cost. This <br />will provide a reduction in operational cost which the funds could be used for other cost associated with the college. <br />Attachment number 2 <br />G -2 <br />Page 220 <br />