My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2012 11 19
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2012
>
AG 2012 11 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2012 10:25:00 AM
Creation date
11/27/2017 11:12:18 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
11/19/2012
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />i <br />/I Cabarrus <br />`ICounty Schools <br />October 24, 2012 <br />To: Cabarrus County Board of Education <br />Cabarrus County Board of Commissioners <br />From: Kelly H. Kluttz, Chief Financial Officer <br />Cabarrus County Schools <br />RE: Request to Move QSCB Funds <br />4425 Old Airport Road <br />PO Box 388 <br />Concord, NC 28026 -0388 <br />(704) 262 -6144 <br />(704) 262 -6225 (fax) <br />Cabarrus County Schools requests the following movement of QSCB funds: <br />1) Northwest Cabarrus Middle School Heat Pump Replacement (16,774) <br />Mt. Pleasant Elementary School A/C Replacement 16,774 <br />Justification: <br />The additional funding will pay for the use of a higher lift capacity construction crane needed to <br />span over an existing underground storage tank that was not known prior to bidding. The <br />Northwest Cabarrus Middle School Heat Pump Replacement is 100% complete. <br />2) Concord Chillers and Controls <br />Central Cabarrus High School Windows <br />(31,836) <br />31,836 <br />Justification: <br />The scope of work for the Central Cabarrus Window Replacement did not anticipate the need to <br />provide Asbestos Abatement nor the replacement of ceilings and floor tile. The additional <br />funding will cover: gymnasium transite panel removal and disposal, VCT floor tile replacement in <br />corridor and classroom, countertop replacement, new steel door lintel at Band Room, and panel <br />replacement sheathing at gymnasium. The Concord High Chillers and Controls project is 97 % <br />complete. <br />3) Beverly Hills Elementary School Windows <br />J.N. Fries Middle School /PLC Renovations <br />(1,912) <br />1,912 <br />Justification: <br />This funding is needed to tie -in the new PLC fire alarm system to the existing system, per fire <br />code. The Beverly Hills Elementary School Windows project is 100% complete. <br />Sign d: <br />jff J <br />Kell H �4lu <br />Y ttt CPA <br />Chief Financial Officer <br />Attachment number 1 <br />G -3 Page 227 <br />
The URL can be used to link to this page
Your browser does not support the video tag.