Laserfiche WebLink
c. Provide project reports, plans, photographs, or other documents that verify the project's completion <br />attach or reference items already provided to CWMTF : <br />d. Describe participation in the project by local partners or stakeholders (funding, in -kind contributions, <br />and /or other): <br />e. Provide a map showing the project site and identifying locations of the stormwater BMPs identified <br />in Exhibit A: <br />f. BMP costs (complete the following table; include all costs for BMP design, permitting, construction, <br />and construction administration /observation <br />Total Area Tributary <br />Impervious Area Tributary <br />Design Volume of Stormwater <br />BMP Identified in <br />to the BMP <br />to the BMP <br />Treated b the BMP <br />Exhibit A <br />acres <br />cost/acre <br />acres <br />cost/acre <br />cubic feet <br />cost/cubic foot <br />Constructed Site <br />3 bioretention <br />area <br />Constructed Site <br />6 bioretention <br />area <br />Constructed Site <br />7 bioretention <br />area <br />Constructed Site <br />5 enhanced <br />grassed swale & <br />regular grassed <br />swale <br />Constructed Site <br />8 constructed <br />wetland <br />Pro�llde the; olw�as built Information for each stormwater BMP inthis[;projectx <br />.- <br />g. Plan drawing showing the arrangement and dimensions of the BMP, locations of inlets, outlets, and <br />sites for monitoring water quality: <br />h. Estimates of reduction in annual rates of pollutant runoff because of the project (attach calculations <br />and identify sources of input for calculations): <br />Signature <br />Cabarrus Soil and Water Conservation District <br />CWMTF 2010 -703; Cox Mill School Stormwater BMPs <br />Date <br />23 <br />APOnpig number 1 <br />F -7 <br />