My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2011 01 18
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2011
>
AG 2011 01 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 9:44:42 PM
Creation date
11/27/2017 11:13:55 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/18/2011
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
556
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Provide project reports, plans, photographs, or other documents that verify the project's completion <br />attach or reference items already provided to CWMTF : <br />d. Describe participation in the project by local partners or stakeholders (funding, in -kind contributions, <br />and /or other): <br />e. Provide a map showing the project site and identifying locations of the stormwater BMPs identified <br />in Exhibit A: <br />f. BMP costs (complete the following table; include all costs for BMP design, permitting, construction, <br />and construction administration /observation <br />Total Area Tributary <br />Impervious Area Tributary <br />Design Volume of Stormwater <br />BMP Identified in <br />to the BMP <br />to the BMP <br />Treated b the BMP <br />Exhibit A <br />acres <br />cost/acre <br />acres <br />cost/acre <br />cubic feet <br />cost/cubic foot <br />Constructed Site <br />3 bioretention <br />area <br />Constructed Site <br />6 bioretention <br />area <br />Constructed Site <br />7 bioretention <br />area <br />Constructed Site <br />5 enhanced <br />grassed swale & <br />regular grassed <br />swale <br />Constructed Site <br />8 constructed <br />wetland <br />Pro�llde the; olw�as built Information for each stormwater BMP inthis[;projectx <br />.- <br />g. Plan drawing showing the arrangement and dimensions of the BMP, locations of inlets, outlets, and <br />sites for monitoring water quality: <br />h. Estimates of reduction in annual rates of pollutant runoff because of the project (attach calculations <br />and identify sources of input for calculations): <br />Signature <br />Cabarrus Soil and Water Conservation District <br />CWMTF 2010 -703; Cox Mill School Stormwater BMPs <br />Date <br />23 <br />APOnpig number 1 <br />F -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.