My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2011 03 21
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2011
>
AG 2011 03 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 9:14:17 PM
Creation date
11/27/2017 11:14:41 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/21/2011
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�1 <br />AMENDMENT #1 TO THE <br />CONTRACT FOR CONSTRUCTION MANAGER AT RISK <br />FOR THE CONSTRUCTION <br />OF THE CABARRUS COUNTY BOARD OF ELECTIONS <br />RENOVATION PROJECT <br />BETWEEN CABARRUS COUNTY, OWNER AND <br />CM BLACK CONSTRUCTION CO., INC., <br />CONSTRUCTION MANAGER AT RISK <br />Pursuant to Article 7 of the Contract, the Owner and Construction Manager established a <br />Guaranteed Maximum Price and Contract Time for the work as set forth below: <br />ARTICLE 1 - GUARANTEED MAXIMUM PRICE <br />The Construction Manager's Guaranteed Maximum Price for the construction of the <br />Board of Elections Complete Renovation Project, including the estimated Cost of Work as <br />defined in the Contract and the Construction Manager's Fee as therein defined is: <br />$1,178,034.00 <br />. This price is for the performance of construction of the complete Board of Elections <br />Renovation Project in accordance with the Contract Documents and the following additional <br />documents: <br />1. Guaranteed Maximum Price Book of CM Black Construction Co., Inc. dated <br />February 21, 2011, which is incorporated by reference. <br />2. CM Black Construction Co., Inc.'s Bid Package Manual dated December 3, 2010, <br />which is incorporated by reference. <br />by reference. <br />CM Black Construction Co., Inc.'s Addendums #1 and #2, which are incorporated <br />ARTICLE 2 — CONTRACT TIME <br />The date of substantial completion established by this Amendment is <br />OWNER: <br />CABARRUS COUNTY, North Carolina <br />Date: <br />John Day, County Manager <br />Rl <br />Attachment number 2 <br />G -3 Page 157 <br />
The URL can be used to link to this page
Your browser does not support the video tag.