Laserfiche WebLink
SCHEDULE B <br />Subcontractor Compensation <br />Subcontractor will be compensated a labor rate of Dollars and Cents ($ . ) per man -hour. Typical crew <br />size is persons. The labor rate quoted must include all overhead cost including travel, worker <br />compensation (at Prevailing Wage) equipment, maintenance, administrative costs, and work pay. <br />Material <br />Specification <br />Labor Price <br />($ / sq.ft.) <br />Material Price <br />($ / sq.ft.) <br />Total Price <br />$ / sq.ft.) <br />Attic Insulation <br />Blown Cellulose, Site Built Attic <br />R -38 (from R -0) <br />Blown Cellulose, Site Built Attic <br />R -30 <br />Blown Cellulose, Site Built Attic <br />R -19 <br />Blown Cellulose, Site Built Attic <br />R -11 <br />Blown Fiberglass, Site Built Attic <br />R -38 (from R -0) <br />Blown Fiberglass, Site Built Attic <br />R -30 <br />Blown Fiberglass, Site Built Attic <br />R -19 <br />Blown Fiberglass, Site Built Attic <br />R -11 <br />Blown Fiberglass, Roof <br />Mobile Home <br />Sidewall Insulation <br />Dense - Packed Cellulose, <br />Sidewall <br />3 Studs <br />Dense - Packed Cellulose, <br />Sidewall <br />5 Studs <br />Kneewall Insulation <br />3 Studs <br />Fiberglass Placement Sidewall <br />Mobile Home <br />Crawls ace Vapor Barrier <br />Vapor Barrier, Crawlspace 6 -mil poly <br />Record the prices for installing insulation and vapor barrier in the chart above. The total per square foot <br />price must be equal to the sum of the labor price and the material price. These price categories should be <br />adequate for installing insulation in most weatherization situations. If a particular category will not apply, <br />indicate by stating (N /A) "not applicable" in the price sections. Please avoid adding unnecessary price <br />categories. <br />*Hourly labor rate cannot be charged for time spent installing insulation. <br />Solicitation No. 2011WXSSP <br />Pape 34 of 53 <br />Attachment number 1 <br />F -4 Page 146 <br />