Laserfiche WebLink
§ 3.2.5.1 The Architect shall consider environmentally responsible design alternatives, such as material choices and <br />building orientation, together with other considerations based on program and aesthetics, in developing a design that is <br />consistent with the Owner's program, schedule and budget for the Cost of the Work. The Owner may obtain other <br />environmentally responsible design services under Article 4. <br />§ 3.2.5.2 The Architect shall consider the value of alternative materials, building systems and equipment, together <br />with other considerations based on program and aesthetics, in developing a design for the Project that is consistent <br />with the Owner's program, schedule and budget for the Cost of the Work. <br />§ 3.2.6 The Architect shall submit to the Owner an estimate of the Cost of the Work prepared in accordance with <br />Section 6.3. <br />§ 3.2.7 The Architect shall submit the Schematic Design Documents to the Owner, and request the Owner's approval. <br />§ 3.3 DESIGN DEVELOPMENT PHASE SERVICES <br />§ 3.3.1 Based on the Owner's approval of the Schematic Design Documents, and on the Owner's authorization of any <br />adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design <br />Development Documents for the Owner's approval. The Design Development Documents shall illustrate and describe <br />the development of the approved Schematic Design Documents and shall consist of drawings and other documents <br />including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix <br />and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and <br />such other elements as may be appropriate. The Design Development Documents shall also include outline <br />specifications that identify major materials and systems and establish in general their quality levels. <br />§ 3.3.2 The Architect shall update the estimate of the Cost of the Work. <br />§ 3.3.3 The Architect shall submit the Design Development Documents to the Owner, advise the Omer of any <br />adjustments to the estimate of the Cost of the Work, and request the Owner's approval. <br />§ 3.4 CONSTRUCTION DOCUMENTS PHASE SERVICES <br />§ 3.4.1 Based on the Owner's approval of the Design Development Documents, and on the Owner's authorization of <br />any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare <br />Construction Documents for the Owner's approval. The Construction Documents shall illustrate and describe the <br />further development of the approved Design Development Documents and shall consist of Drawings and <br />Specifications setting forth in detail the quality levels of materials and systems and other requirements for the <br />construction of the Work. The Owner and Architect acknowledge that in order to construct the Work the Contractor <br />will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, <br />which the Architect shall review in accordance with Section 3.6.4. <br />§ 3.4.2 The Architect shall incorporate into the Construction Documents the design requirements of governmental <br />authorities having jurisdiction over the Project. <br />§ 3.4.3 During the development of the Construction Documents, the Architect shall assist the Owner in the <br />development and preparation of (1) bidding and procurement information that describes the time, place and conditions <br />of bidding, including bidding or proposal forms; (2) the form of agreement between the Owner and Contractor; and (3) <br />the Conditions of the Contract for Construction (General, Supplementary and other Conditions). The Architect shall <br />also compile a project manual that includes the Conditions of the Contract for Construction and Specifications and <br />may include bidding requirements and sample forms. <br />§ 3.4.4 The Architect shall update the estimate for the Cost of the Work. <br />§ 3.4.5 The Architect shall submit the Construction Documents to the Owner, advise the Owner of any adjustments to <br />the estimate of the Cost of the Work, take any action required under Section 6.5, and request the Owner's approval. <br />AIA Document B101 T"^ — 2007 formerly B151 T ' ^ — 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights <br />[nit. reserved. WARNING: This AIA Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of <br />this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under <br />the law. This document was produced by AIA software at 11:15:50 on 07/08/2011 under Order No.8789296886_1 which expires on 05/10/2012, and is not for <br />resale. <br />User Notes: A MAN %nf ltuin ber 1 <br />G -4 Page 254 <br />