My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2011 08 15
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2011
>
AG 2011 08 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2011 9:32:21 AM
Creation date
11/27/2017 11:16:35 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/15/2011
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 3.6.4.2 In accordance with the Architect- approved submittal schedule, the Architect shall review and approve or take <br />other appropriate action upon the Contractor's submittals such as Shop Drawings, Product Data and Samples, but only <br />for the limited purpose of checking for conformance with information given and the design concept expressed in the <br />Contract Documents. Review of such submittals is not for the purpose of determining the accuracy and completeness <br />of other information such as dimensions, quantities, and installation or performance of equipment or systems, which <br />are the Contractor's responsibility. The Architect's review shall not constitute approval of safety precautions or, <br />unless otherwise specifically stated by the Architect, of any construction means, methods, techniques, sequences or <br />procedures. The Architect's approval of a specific item shall not indicate approval of an assembly of which the item is <br />a component. <br />§ 3.6.4.3 If the Contract Documents specifically require the Contractor to provide professional design services or <br />certifications by a design professional related to systems, materials or equipment, the Architect shall specify the <br />appropriate performance and design criteria that such services must satisfy. The Architect shall review Shop Drawings <br />and other submittals related to the Work designed or certified by the design professional retained by the Contractor <br />that bear such professional's seal and signature when submitted to the Architect. The Architect shall be entitled to rely <br />upon the adequacy, accuracy and completeness of the services, certifications and approvals performed or provided by <br />such design professionals. <br />§ 3.6.4.4 Subject to the provisions of Section 4.3, the Architect shall review and respond to requests for information <br />about the Contract Documents. The Architect shall set forth in the Contract Documents the requirements for requests <br />for information. Requests for information shall include, at a minimum, a detailed written statement that indicates the <br />specific Drawings or Specifications in need of clarification and the nature of the clarification requested. The <br />Architect's response to such requests shall be made in writing within any time limits agreed upon, or otherwise with <br />reasonable promptness. If appropriate, the Architect shall prepare and issue supplemental Drawings and <br />Specifications in response to requests for information. <br />§ 3.6.4.5 The Architect shall maintain a record of submittals and copies of submittals supplied by the Contractor in <br />accordance with the requirements of the Contract Documents. <br />§ 3.6.5 CHANGES IN THE WORK <br />§ 3.6.5.1 The Architect may authorize minor changes in the Work that are consistent with the intent of the Contract <br />Documents and do not involve an adjustment in the Contract Sum or an extension of the Contract Time. Subject to the <br />provisions of Section 4.3, the Architect shall prepare Change Orders and Construction Change Directives for the <br />Owner's approval and execution in accordance with the Contract Documents. <br />§ 3.6.5.2 The Architect shall maintain records relative to changes in the Work. <br />§ 3.6.6 PROJECT COMPLETION <br />§ 3.6.6.1 The Architect shall conduct inspections to determine the date or dates of Substantial Completion and the date <br />of final completion; issue Certificates of Substantial Completion; receive fi•otn the Contractor and forward to the <br />Owner, for the Owner's review and records, written warranties and related documents required by the Contract <br />Documents and assembled by the Contactor; and issue a final Certificate for Payment based upon a final inspection <br />indicating the Work complies with the requirements of the Contract Documents. <br />§ 3.6.6.2 The Architect's inspections shall be conducted with the Owner to check conformance of the Work with the <br />requirements of the Contract Documents and to verify the accuracy and completeness of the list submitted by the <br />Contractor of Work to be completed or corrected. <br />§ 3.6.6.3 When the Work is found to be substantially complete, the Architect shall inform the Owner about the balance <br />of the Contract Sum remaining to be paid the Contractor, including the amount to be retained fi the Contract Sum, <br />if any, for final completion or correction of the Work. <br />§ 3.6.6.4 The Architect shall forward to the Owner the following information received from the Contractor: (1) <br />consent of surety or sureties, if any, to reduction in or partial release of retainage or the making of final payment; (2) <br />affidavits, receipts, releases and waivers of liens or bonds indemnifying the Owner against liens; and (3) any other <br />documentation required of the Contractor under the Contract Documents. <br />AIA Document 8101 TM — 2007 formerly 8151 T ' ^ — 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights <br />Init. reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 9 <br />this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under <br />the law. This document was produced byAlA software at 11:15:50 on 07/08/2011 under Order No.8789296886_1 which expires on 05/10/2012, and is not for <br />resale. <br />User Notes: AttflFt tee & mber 1 <br />G -4 Page 257 <br />
The URL can be used to link to this page
Your browser does not support the video tag.