My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2011 12 19
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2011
>
AG 2011 12 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2012 2:43:55 PM
Creation date
11/27/2017 11:20:47 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
12/19/2011
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cabarrus Co /Raging Ridge Rd <br />WKD 20100194 — Amend 3 <br />Page 3 of 4 <br />3. Attend construction coordination meetings if required by the project. <br />Schedule <br />Design Phase Engineering Services: <br />1. Contact and meet with Project Team: 2 weeks <br />2. Prepare applications for wetland encroachment permits: 8 weeks <br />3. Surveying services: <br />a. Pre - design surveys: 3 weeks <br />b. Right -of —way plats: To be completed on schedule with final design plans <br />4. Engineering design services: <br />a. Coordinate geotechnical services: 4 weeks <br />b. Preparation of construction plans and specifications: 8 weeks <br />c. Preparation of permit applications: 6 weeks <br />Construction Phase Services: <br />1. Solicit bids: 2 weeks after OWNER receiving permits <br />2. Bidding and award: 4 weeks after soliciting bidders <br />3. Provide construction administration services: 16 weeks after award of construction contract <br />Construction Observation Services: <br />1. Periodic construction observation services: 16 weeks after award of construction contract <br />Basis of Compensation <br />We will provide the additional services for a lump sum fee of $179,600 as follows: <br />Engineering Services <br />Engineering and Surveying Services <br />Hydraulic Report <br />NCDOT Bridge Design Coordination <br />Permitting <br />Geotechnical & Testing <br />$79,600 Lump Sum <br />$15,000 Lump Sum <br />$ 2,000 Lump Sum <br />$ 9,000 Lump Sum <br />$ 5,000 Lump Sum <br />Construction Administration Services <br />Bidding & Construction Administration <br />Construction Observation Services <br />Construction Observation <br />$24,000 Lump Sum <br />$45,000 Lump Sum <br />The CONSULTANT will bill on the last day of each month for percentage of work complete as of <br />the last day of the month, plus expenses. <br />Attachment number 1 <br />G -1 Page 83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.