My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2010 08 16
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2010
>
AG 2010 08 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2011 8:11:31 AM
Creation date
11/27/2017 11:23:04 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/16/2010
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Obtaining a D -U -N -S number or the Contractor may use their name and zip code of their <br />Headquarters. <br />• Expenditure amount (amount of payment) <br />• Expenditure description (what was exchanged for the payment) <br />etained. "Jobs or positions created" mean <br />• A brief description of the types of jobs created and jobs r <br />those new.positions created and filled, or previously existing unfilled positions that are filled, as a <br />result of Recovery Act funding. "Jobs or positions retained" mean those previously existing filled <br />positions that are retained as a result of Recovery Act funding. <br />• An estimate of the number of jobs created and jobs retained. At a minimum, this estimate shall <br />include any new positions created and any existing filled. positions that were retained to support or <br />carry out Recovery Act projects. The number shall be expressed as "full -time equivalent" (ETE), <br />calculated cumulatively as all hours worked divided by the total number of hours in a full -time <br />schedule. <br />• A job cannot be reported as both created and retained, <br />• This information must be reported on a quarterly basis, due to the Prime Recipient within 3 days <br />after the end of the quarter. <br />ARRA Section 1201 (c) <br />• This data will be required monthly until September or until the contract is complete and <br />reported to the Prime Recipient within 3 days after the end of the month. <br />Contractors will need to report the number of direct on -site job hours associated with the ARRA <br />funds awarded as of the end of the reporting period. <br />o Contractors will not be expected to estimate employment data other than the direct on -site jobs <br />(for example, construction workers building a maintenance facility, or transit agency workers <br />doing preventive maintenance). Department of Transportation economists will compute the <br />number of indirect jobs (for example at bus manufacturing plants) or induced jobs (for example, <br />jobs at suppliers or in unrelated industries as a result of the money flowing through the <br />economy.) <br />51 <br />Attachment number 2 <br />F -5 Page 182 <br />
The URL can be used to link to this page
Your browser does not support the video tag.