Laserfiche WebLink
Project Costs <br />Rob Wallace Park — Cabarrus Count <br />January 2010 <br />Project Elements (Include specific units - sizes, <br />Unit <br />Total <br />numbers, lengths, etc. - for each item.) <br />Unit <br />Cost <br />Item Cost <br />Building and /or Renovating Costs <br />Ent road through site road base, asphalt, etc. <br />Entry (including g ( g p ) <br />5,100 <br />$71.00 <br />$362,100 <br />LF <br />Fishing pier boardwalk <br />800 LF <br />$200 <br />$160,000 <br />Bike and Hike Trail 12' wide <br />Trail ( 12' <br />10,000 <br />$15.00 <br />$150,000 <br />LF <br />Restroom /Storage /Sales at pier <br />Sump <br />$100,000 <br />$100,000 <br />Mountain Bike trail (Approximately 4 +/- miles) <br />S u m <br />$20,000 <br />$20,000 <br />Parking Lot - for 120 cars <br />S u m p <br />$240,000 <br />$240,000 <br />Picnic area (pavilion, tables, grill, trash cans) <br />$81,400 <br />$81,400 <br />S um <br />Playground (Covered for shading) <br />Sump <br />$100,000 <br />$100,000 <br />Costs to Develop the <br />Project <br />$1,213,500 <br />Contingency for the Cost of Building / Renovating <br />Contingency (not to exceed 5% of the cost to develop the <br />5% <br />$60,675 <br />project) <br />Value of Land to be Purchased or Donated <br />N/A <br />Costs Related to Building, Renovating and Planning <br />Planning / Incidental Land Costs- Construction <br />management, site planning, preliminary design, survey <br />LS <br />$59,510 <br />$59,510 <br />and appraisals, or the cost of preparing the application <br />(not to exceed 20% of the cost of the project) <br />Total <br />Project Cost <br />$1,333,685 <br />Total PARTF Grant Request <br />$500,000 <br />Total Local Match <br />$833,685 <br />Attachment number 1 <br />F -11 Page 252 <br />