My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2009 06 15
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2009
>
AG 2009 06 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2010 4:01:01 PM
Creation date
11/27/2017 11:25:33 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/5/2010
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />' <br /> ^ Tltis proposal is based on installation upon subgrade which is firm, clry, and smooth. Liner <br /> installation is contingent upon subhrade approvitl I>y I•.lallaton, Inc. No dcvisttion from this <br /> requirement will he accepted. <br />' ^ Work e:nviranmcnt to be love! "D"classification only. <br /> ^ Cctst of payment and performance bonds not inelucted. <br /> ^ Sales "1•a~ is included in this Proposal. <br />' ^ Work delays or interruptions caused by incompiete. sh•uctures, subbiades, standing tints caused by the <br /> Otvnet•, Contractor, or any other reason beyond I-lallatott's control (ctxcept weather delitys), wit{ be <br /> charged to the C)wner or Contractor at our hourly rate of"C70U.00 per hour for a minimum of four hours <br />~ I)er clay, and a tnaxinutm ol•eight hours per clay plus expenses if any. <br />' ^ ll'tvorlc scheduling calls I'or cold rreuthcr seaming practice to be used at any lime, iu order to <br /> seen any material below 4U degrees (+., an increase in pricing shall be made. <br /> ^ 1'cstittg: I~tallatan will provide non-destructive and desh•uctive field seam testing ofgcontembrane. <br /> I-Inllatoit will provide laboratory destructive scant testing as specified in Section 02776, i.(17.D. <br />' 1-lallaton will provide conformance testing as spc.~c;ificd in Section 02274, 2.t)4.A; Section 02776, <br /> 2.U3.A. I-lailatan twill provide Interface SI)cilC teSllllg ilS Spe;Gllled In Sectictlt 02274, 1.03.A.10. <br /> Interface test results are dependent upon engineer c[esign and site specific conditions outsider 1•Iallatan's <br />' control Site soils for interface testing to be supplied and shipped by others. A.ny ocher testing is hereby <br /> excluded from this proposal. <br /> ^ An}r aS-bllllt SI101) dl'awlltE!S by I•lallitl011. SUlveyefl i15-built Ch'ittYI11~S~ If required, by others. <br /> ^ Pll)e pelteal'aliall boats Onl}' as IlSfed Flbave. "I•Itere al'C n0 COllel•BtC attachments in this proposal. <br />' ^ I-IaUaton twill provide cquipntCnl to deploy our material <br /> ^ Ttva ycal• installation warranty included. <br />' - IL OWNLR / G'GNCRa1L CONTRAC'C012 1'ROVII)rI) St<,RVICI:S <br />/~. Owner /General C:onb•actar to provide: I-[allaton with the following: <br />^ Acceptance and safe storage of all hlallaton materials (to he delivered to•j<)b site prior to l-lallatolt <br />' personnel Fu•riving). <br />{ ^ Supply ai! equipment necessary to unload and store material prior to I-lallaton ntabili~ntian. <br />t ^ Prior to l-iallaton mobilization, all concrete and piping; work. <br />^ Site is to be; Icvcl and reitdy to receive otu• Finishes. <br />^ All dowacering and snow removal at lining silo. <br />^ Sand fot• tilling Sand bads to prevent wind uplift. <br />^ Reasonable access to and from work sits. <br />' ^ Access to ancf use ofsiutiraly titcilities for Ifallaton personnel. <br />^ Acceptance eland full support of 1-IaUah)n production force being non-union. <br />^ Disposal of waste off site if necessary. <br />i ~ <br />III. ElA1JLATON TEI~MS Or I AYM.rNT <br />r~. Installation twill be billed as the,job prag,resses; terms arc net 30 clays. <br />' t3. lnlcrest of l.5%, per monkh wit{ be charted on ctvcl•due balance. <br />C. Material will be billed span delivery. Retention twill nut be hc;ld. <br />IV. SCE{I;DLILING <br />A. Chvner ogress to coordinate hlallaton required scope of work schedulin~~ sa to allow I•lallaton a <br />minimum of four week Ics:id~timc Pi)r schcdalin;; lout ordering material. <br />' 43. Owners will titlly support I•lallaton requirement tc~ work extended hours each clay nn a SCVen- <br />Day-Week basis, iE•needed to finish a critical area. <br />' 3af3 <br /> <br />F-13 <br />Attachment number 4 <br />Page 287 of 433 <br />
The URL can be used to link to this page
Your browser does not support the video tag.