Laserfiche WebLink
u <br /> ' <br />teen l8 months of <br />§ 3.3.4 If the services covered by this Agreement have not been completed wtlhul Eigh ( _) <br />the date of this Agreement, through no fault of the Architect, extension of the Architect's services beyond that time <br />shall be compensated as Additional Services. <br />' <br />ARTICLE 4 OWNER'S RESPONSIBILITIES <br />§ 4.1 The Owner shall establish and periodically update the Owner's budget for the P-•oject, including (1) the budget <br />' <br /> <br />s other costs; and, (3) reasonable contingencies <br />for• the Cost of the Work as defined in Section 5. l; (2) the Ownet• , <br />related to all of these costs. If the Owner significantly increases or decreases the Owner's budget for the Cost of the <br />Work, the Owner shall notify the Architect. The Owner and the Architect shall thereafter agree to a corresponding <br />change in the Project's scope and quality. ' <br />§ 4.2 The Owner shall furnish surveys to describe physical characteristics, legal limitations and utility locations for <br />the site of the Project, and a written legal desct•iption of the site. The surveys and legal information shall include, as <br />applicable, grades and lines of streets, alleys, pavements and adjoining property and structures; designated wetlands; , <br />adjacent drainage; rights-of-way, restrictions, easements, encroachments, zoning, deed testtictions, boundaries and <br />contours of the site; locations, dimensions and necessary data with respect to existing buildings, other improvements <br />and trees; and information concerning available utility services and lines, both ublic and private, above and below <br />h <br />k <br />mar <br />. <br />grade, including inverts and depths. All the information on the survey shall erenced to a Project benc ' <br />§ 4.3 The Owner shall furnish services of geotechnical engineers, whic ude but are not limited to test <br />borings, test pits, determinations of soil beating values, percolation s , eval s of hazardous materials, seismic <br />evaluation, ground corrosion tests and resistivity tests, including ssary opera for anticipating subsoil <br />conditions, with written reports and appropriate recommendat' <br />§ 4.4 The Owner shall furnish tests, inspections and reports re aw or the Contract Documents, such as <br />structural, mechanical, and chemical tests, tests for ai and water lion, and tests for hazardous materials. <br />§ 4.5 Except as otherwise provided in this Agreemen r ct c unieations have been specially <br />authorized, the Owner shall endeavor to communicate 'th for and the Architect's consultants through <br />the Architect about matters arising out of 'ng to ontract Documents. The Ownet• shall promptly notify <br />the Architect of any direct communica ' the y aff the Architect's services. <br />§ 4.6 Before executing the Contract ons ~ner shall coordinate the Architect's duties and <br />ment <br />thi <br />A <br />th i <br />t f <br />' <br />i <br />hi <br />. <br />n <br />s <br />gree <br />or <br />s serv <br />ces se <br />tect <br />responsibilities set forth in the Contrac nstruction with the Arc <br />The Owner shall provide th a c f the executed agreement between the Owner and Contractor, <br />including the General C tons of on or Construction. <br />§ 4.7 The Owner shall pr• the Archi t access to the Project site prior to commencement of the Work and shall <br />obligate the Contractor top a the 'tect access to the Work wherever it is in preparation or progress. <br />ARTICLE 5 COST OF THE WORK <br />§ 5.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all <br />elements of the Project designed ot• specified by the Architect and shall include contractot•s' general conditions costs, <br />overhead and profit. The Cost of the Work does not include the compensation of the Architect, the costs of the land, <br />tights-of--way, financing, contingencies for changes in the Work or other costs that are the responsibility of the <br />Owner. <br />§ 5.2 The Owner's budget for the Cost of the Work is provided in Initial Information, and maybe adjusted <br />throughout the Project as requited under Sections 4.1, 5.4 and 5.5. Evaluations of the Owner's budget for the Cost of <br />the Work, the preliminary estimate of the Cost of the Work and updated estimates of the Cost of the Work prepared <br />by the Architect, represent the Architect's judgment as a design professional. It is recognized, however, that neither <br />the Architect not• the Owner• has control over the cost of labor, materials or equipment; the Contractor's methods of <br />determining bid prices; or competitive bidding, market or negotiating conditions. Accordingly, the Architect cannot <br />and does not warrant or represent that bids or negotiated prices will not vary from the Owner's budget for the Cost <br />of the Work or fiorn ally estimate of the Cost of the Work or evaluation prepared or agreed to by the Architect. ' <br />AIA Document B201T^~ - 2007 (formerly 8741 T~~ -1987 Part 2). Copyright ®1917, 1926, 1948,1951,1953, 1958, 1961, 1963, 1966,1967, 1870,. 1974, ' <br />1977, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WANNINti: This AIA° Document is protected by ti.$. Copyright 10 <br />Law and Internatlonsi Trestles. Unauthorized reproduction or distribution of this AIA° Document, or any portion of It, mny result in severe civil and <br />criminal penalties, and wlli be prosecuted to the maximum extent possible under the law. This document was produced by AIA sot`ware at 14:22:19 on <br />05127!2009 under Order No.1000356205_t which expires on 7/2 512 00 9, and Is not for resale. Attachment number 4 <br />User Notes: (3914967289) ' <br />F-1 Page 88 of 433 <br />