My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2009 07 20
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2009
>
AG 2009 07 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2010 9:53:28 AM
Creation date
11/27/2017 11:25:56 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/8/2010
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gaston College Regional Emergency <br />Services Training Facility <br />Dallas, NC <br />,., _ . <br /> <br />7 <br />'[ <br />t C <br />Mr. Phil Welch, Gastonia Fire Chief 704.866.6807 <br />Previous Fire Training Director <br />acili <br />1500 SF ~ <br />$ 75,000 Estimated Base Bid <br />i <br />D@SigJl Issues <br />Friar o the completion of this project, all on-site, resi- <br />dential,traming simulation had to be performed in the ;1 <br />adjacent commercial, bum building. The shear size and <br />configuration of the large burn building severely limited <br />'the realtsm,of a residential setting-,..,The residential burn r <br />building is unlike most any others currenfiyln use in that <br />`the floor plan mimics `a three bedroom, twin bath single <br />family dwelling It rs constructed of masonry walls, and <br />a concrete roof deck':' Each room has appropriate;heat } <br />shields m-order to protect tits structure from, heat also- <br />ciated wlth.limited.live burns.' Trench drains are Cori- <br />..; <br />.;:. <br />tenuous throughout,fhe building for training and building <br />'wash-down. 'A sloped, frame roof was set above the <br />concrete roof deck for more realistic training scenarios <br />that include a continuous heat/smoke shaft for roof pen- <br />etratlon training. Many of the beneficial details uiilized <br />'in the commercial burn building were incorporated into <br />i <br />G~ Stewart Coo,~er .Newell <br />~_ ~ ~,~ ~_,~ r <br />^ www.scn-archltects.ro+n <br />^ 1.800.671.0621 Attachment number 5 <br />F-$ Page 189 of 627 <br />
The URL can be used to link to this page
Your browser does not support the video tag.