Laserfiche WebLink
CABARRUS COUNTY ZONING ORDINANCE <br />Overhead and/or underground utilities, roads, streets, bridges, or similar structures <br />should be placed within existing public rights-of-way and must cross the buffer as <br />close to perpendicular as possible. <br />Any proposed recreation facilities or greenways must be located a minimum of 60' <br />from the top of the stream bank. This includes any proposed pedestrian, hiking or <br />biking trails. Recreational structures are not permitted in the waterbody buffer. <br />8C) In the event that a buffer is disturbed, all disturbed areas within the buffer <br />zone shall be revegetated with appropriate vegetation immediately. Forested <br />areas shall be reforested as detailed in the approved replacement program <br />discussed in 8A above. <br />8D) A progress report shall be submitted by the individual, corporation, or <br />company disturbing land in the Waterbody Buffer Zone to the Cabarrus County <br />Planning and Zoning Department within 60 days of approval of the replacement <br />program by the Soil and Water Conservation District staff. Two other reports may <br />be required at 120 and 180 days if the program is not completed. The first two <br />reports shall explain what work has been completed and any results as well as a <br />time schedule for completion of the rest of the program. The final report shall <br />document that the replacement program has been completed. The site shall be <br />regularly inspected by the enforcement branch of the Cabarrus County Planning <br />and Zoning Department and the Cabarrus Soil and Water Conservation District to <br />assure activity and compliance. Any noncompliance shall be treated as a zoning <br />violation and be subject to enforcement as described in Chapter Twelve of this <br />Ordinance. <br />9. A minimum setback far all buildings from the buffer for waterbodies as <br />classified and defined in Section 4-10-1 shall be at least 20 feet. For waterbodies <br />classified and defined in Section 4-10-2, the setback shall be a minimum of 10 feet <br />from the buffer. If there is a difference in the zoning ordinance setback and the no <br />build buffer, the greater of the two shall apply. No building or structures shall be <br />permitted in the no build buffer area. <br />10. Where the Water Body Buffer Zone or no build buffer impacts or is part of <br />a lot, a note shall be placed on the plat or site plan and a restriction shall become <br />part of the deed for the property stating that said property is subject to the <br />Waterbody Buffer Zone. <br />11. Applicants and property owners are strongly encouraged to consider the <br />dedication of property or easements subject to the Water Body Buffer Zone to one <br />of the following when appropriate: <br />4-8 <br />G-2 <br />Attachment number 3 <br />Page 186 <br />